Waste Water Engineering In a grit chamber of a sewage treatment plant, One minute of detention period is kept Depth of 0.9 m to 1.20 m is kept Flow velocity 0.15 m to 0.3 m/sec is kept All of these One minute of detention period is kept Depth of 0.9 m to 1.20 m is kept Flow velocity 0.15 m to 0.3 m/sec is kept All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For detecting the nitrates in sewage, the colour may be developed by adding Phenol-di -sulphuric acid and potassium hydroxide Sulphuric acid and napthamine None of these Potassium permanganate Phenol-di -sulphuric acid and potassium hydroxide Sulphuric acid and napthamine None of these Potassium permanganate ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit and silt of the grit chambers, may not be used for Neither A nor B Raising low lying areas by dumping Both A and B Concreting Neither A nor B Raising low lying areas by dumping Both A and B Concreting ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a fully mechanised composting plant, involves All of these Mechanized segregation Mechanized receipt Mechanized pulverising of refuse All of these Mechanized segregation Mechanized receipt Mechanized pulverising of refuse ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which transports the sewage to the point of treatment, is called Out-fall sewer House sewer Main sewer Branch sewer Out-fall sewer House sewer Main sewer Branch sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Antisyphonage pipe is fitted At the beginning of sewer line With a W.'trap On manholes At the end of septic tanks At the beginning of sewer line With a W.'trap On manholes At the end of septic tanks ANSWER DOWNLOAD EXAMIANS APP