Waste Water Engineering In a grit chamber of a sewage treatment plant, Flow velocity 0.15 m to 0.3 m/sec is kept One minute of detention period is kept All of these Depth of 0.9 m to 1.20 m is kept Flow velocity 0.15 m to 0.3 m/sec is kept One minute of detention period is kept All of these Depth of 0.9 m to 1.20 m is kept ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is 2 hours 30 minutes 1 hour and 30 minutes 1 hour 2 hours 30 minutes 1 hour and 30 minutes 1 hour ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The minimum recommended diameter of sewers, is 5 cm 10 cm 15 cm 20 cm 5 cm 10 cm 15 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The discharge per unit plan area of a sedimentation tank, is generally called Surface loading Over flow rate Over flow velocity All of these Surface loading Over flow rate Over flow velocity All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a grit chamber, if the recommended velocity of flow is 0.2 m/sec and detention period is 2 minutes, the length of the tank, is 30 m 16 m 24 m 20 m 30 m 16 m 24 m 20 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at Three fourth full Two third full Half full Full depth Three fourth full Two third full Half full Full depth ANSWER DOWNLOAD EXAMIANS APP