Waste Water Engineering In a grit chamber of a sewage treatment plant, Flow velocity 0.15 m to 0.3 m/sec is kept Depth of 0.9 m to 1.20 m is kept All of these One minute of detention period is kept Flow velocity 0.15 m to 0.3 m/sec is kept Depth of 0.9 m to 1.20 m is kept All of these One minute of detention period is kept ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A drop manhole is provided if A branch sewer joins the main sewer at higher level None of these A sewer drops from a height A lamp is inserted to check obstruction A branch sewer joins the main sewer at higher level None of these A sewer drops from a height A lamp is inserted to check obstruction ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Drop manholes are the manholes Without manhole covers Without entry ladders With depths more than 3.5 m Having drains at different levels Without manhole covers Without entry ladders With depths more than 3.5 m Having drains at different levels ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of bars for perforations in coarse screens used for the treatment of sewage, is 50 mm 40 mm 30 mm 20 mm 50 mm 40 mm 30 mm 20 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In the activated sludge process Water is removed by centrifugal action Sludge is activated by constant stirring Aeration is done with an admixture of previously aerated sludge Aeration is continued till stability Water is removed by centrifugal action Sludge is activated by constant stirring Aeration is done with an admixture of previously aerated sludge Aeration is continued till stability ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Hume steel pipes are Steel shell coated from outside with cement mortar Both B and C Steel pipes Steel shell coated from inside with cement mortar Steel shell coated from outside with cement mortar Both B and C Steel pipes Steel shell coated from inside with cement mortar ANSWER DOWNLOAD EXAMIANS APP