Waste Water Engineering In a grit chamber of a sewage treatment plant, All of these Flow velocity 0.15 m to 0.3 m/sec is kept Depth of 0.9 m to 1.20 m is kept One minute of detention period is kept All of these Flow velocity 0.15 m to 0.3 m/sec is kept Depth of 0.9 m to 1.20 m is kept One minute of detention period is kept ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering depends upon The Chezy’s constant C in the formula V = C Shape of the sewer Roughness of sewer surface All listed here Size of the sewer Shape of the sewer Roughness of sewer surface All listed here Size of the sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the grit in grit chambers is 4.5 million litres per day, its cleaning is done Hydraulically Mechanically Electrically Manually Hydraulically Mechanically Electrically Manually ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is 90 cm 50 cm 100 cm 80 cm 90 cm 50 cm 100 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For large sewers, maximum distance between manholes may be 300 m 50 m 100 m 200 m 300 m 50 m 100 m 200 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In very first stage of decomposition of the organic matter in sewage Nitrates are formed Carbondioxide is formed Ammonia is formed Nitrites are formed Nitrates are formed Carbondioxide is formed Ammonia is formed Nitrites are formed ANSWER DOWNLOAD EXAMIANS APP