Waste Water Engineering In a grit chamber of a sewage treatment plant, Flow velocity 0.15 m to 0.3 m/sec is kept Depth of 0.9 m to 1.20 m is kept All of these One minute of detention period is kept Flow velocity 0.15 m to 0.3 m/sec is kept Depth of 0.9 m to 1.20 m is kept All of these One minute of detention period is kept ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The minimum diameter of sewer to be adopted is 10 cm 12.5 cm 15 cm 25 cm 10 cm 12.5 cm 15 cm 25 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The suitable cross-section of sewers to carry combined flow, is Horse shoe shaped Rectangular Circular Egg shaped Horse shoe shaped Rectangular Circular Egg shaped ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewerage system consists of All of these House sewer Branch sewer Lateral sewer All of these House sewer Branch sewer Lateral sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 7 days 12 days 14 days 2 days 7 days 12 days 14 days 2 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering With self cleansing velocity in sewers Both silting and scouring occur at bottom Neither silting nor scouring occurs at bottom Scouring occurs at bottom Silting occurs at bottom Both silting and scouring occur at bottom Neither silting nor scouring occurs at bottom Scouring occurs at bottom Silting occurs at bottom ANSWER DOWNLOAD EXAMIANS APP