Waste Water Engineering In a grit chamber of a sewage treatment plant, All of these Depth of 0.9 m to 1.20 m is kept One minute of detention period is kept Flow velocity 0.15 m to 0.3 m/sec is kept All of these Depth of 0.9 m to 1.20 m is kept One minute of detention period is kept Flow velocity 0.15 m to 0.3 m/sec is kept ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For non-scouring velocity 5 m/sec, the type of sewers generally preferred to, is Cement concrete sewers Cast iron sewers Glazed bricks sewers Stone ware sewers Cement concrete sewers Cast iron sewers Glazed bricks sewers Stone ware sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewerage system consists of All of these Branch sewer House sewer Lateral sewer All of these Branch sewer House sewer Lateral sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewers designed with self cleansing velocity, Both silting and scouring occur at the bottom Neither silting nor scouring occurs at the bottom The bottom is scoured The bottom is silted Both silting and scouring occur at the bottom Neither silting nor scouring occurs at the bottom The bottom is scoured The bottom is silted ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most effective arrangement for diverting excess storm water into a natural drainage, is Leaping weir None of these Siphon spill way Overflow weir Leaping weir None of these Siphon spill way Overflow weir ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A nuisance is experienced in diluting water if dilution factor is less than 100 60 40 20 100 60 40 20 ANSWER DOWNLOAD EXAMIANS APP