Let base = b and altitude = h Then, Area = b x h But New base = 110b / 100 = 11b / 10Let New altitude = HThen, Decrese = (h - 10h /11 )= h / 11? Required decrease per cent = (h/11) x (1 / h ) x 100 %= 91/11 %
Area of the room=(544 * 374) size of largest square tile= H.C.F of 544 & 374 = 34 cm Area of 1 tile = (34 x 34) c m 2 Number of tiles required== [(544 x 374) / (34 x 34)] = 176
perimeter = total cost / cost per m = 10080 /20 = 504mside of the square = 504/4 = 126mbreadth of the pavement = 3mside of inner square = 126 - 6 = 120marea of the pavement = (126 x126) - (120 x 120) = 246 x 6 sq mcost of pavement = 246*6*50 = Rs. 73800