Highway Engineering The binder normally used in flexible pavement construction is bitumen cement None of these lime bitumen cement None of these lime ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering On a single lane road with two way traffic, the minimum stopping sight distance is equal to half the stopping distance three times the stopping distance stopping distance two times the stopping distance half the stopping distance three times the stopping distance stopping distance two times the stopping distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Flexible pavement distribute the wheel load directly to subgrade None of these through a set of layers to the subgrade through structural action directly to subgrade None of these through a set of layers to the subgrade through structural action ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For highway geometric design purposes the speed used is 85th percentile 15th percentile 50 “”percentile 98 “”percentile 85th percentile 15th percentile 50 “”percentile 98 “”percentile ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The diagram which shows all important physical conditions of an accident location like roadway limits, bridges, trees and all details of roadway conditions is known as pie chart condition diagram collision diagram spot maps pie chart condition diagram collision diagram spot maps ANSWER DOWNLOAD EXAMIANS APP