Surveying Height of instrument method of levelling is more accurate than rise and fall method less accurate than rise and fall method quicker and less tedious for large number of intermediate sights None of these more accurate than rise and fall method less accurate than rise and fall method quicker and less tedious for large number of intermediate sights None of these ANSWER DOWNLOAD EXAMIANS APP
Surveying Pick up the incorrect statement from the following. The angular distance of heavenly bodies on observer's meridian measured from the pole, is Co-declination Co-altitude Polar distance Co-latitude Co-declination Co-altitude Polar distance Co-latitude ANSWER DOWNLOAD EXAMIANS APP
Surveying The sun's declination remains north between March 21 to June 21 Both (A) and (B) of above June 21 to September 21 September 21 to December 21 March 21 to June 21 Both (A) and (B) of above June 21 to September 21 September 21 to December 21 ANSWER DOWNLOAD EXAMIANS APP
Surveying The permissible error in chaining for measurement with chain on rough or hilly ground is 1 in 100 1 in 500 1 in 1000 1 in 250 1 in 100 1 in 500 1 in 1000 1 in 250 ANSWER DOWNLOAD EXAMIANS APP
Surveying Which of the following methods of offsets involves less measurement on the ground? method of perpendicular offsets method of oblique offsets method of ties all involve equal measurement on the ground method of perpendicular offsets method of oblique offsets method of ties all involve equal measurement on the ground ANSWER DOWNLOAD EXAMIANS APP
Surveying If 16 flight lines are run perpendicular to an area 30 km wide, their spacings on a photographical map on scale 1 : 50,000 , will be 3 cm 2 cm 4 cm 1 cm 3 cm 2 cm 4 cm 1 cm ANSWER DOWNLOAD EXAMIANS APP