Surveying The resection by two point problem as compared to three point problem takes less time requires more labour gives more accurate problem None of these takes less time requires more labour gives more accurate problem None of these ANSWER DOWNLOAD EXAMIANS APP
Surveying The method of surveying by triangulation was first introduced by the Dutchman Snell in 1630 1650 1615 1600 1630 1650 1615 1600 ANSWER DOWNLOAD EXAMIANS APP
Surveying If the intercept on a vertical staff is ob-served as 0.75 m from a tacheometer, the horizontal distance between tacheometer and staff station is 75 m 7.5 m 25 m 50 m 75 m 7.5 m 25 m 50 m ANSWER DOWNLOAD EXAMIANS APP
Surveying The point on the celestial sphere vertically below the observer's position, is called Zenith Nadir Pole Celestial point Zenith Nadir Pole Celestial point ANSWER DOWNLOAD EXAMIANS APP
Surveying The angle between the prolongation of the preceding line and the forward line of a traverse is called None of these direct angle included angle deflection angle None of these direct angle included angle deflection angle ANSWER DOWNLOAD EXAMIANS APP
Surveying The orthogonal projection of the perspective centre on a tilted photograph, is called Principal point Isocenter Plumb point Nadir Principal point Isocenter Plumb point Nadir ANSWER DOWNLOAD EXAMIANS APP