GETCO Exam Paper (22-07-2015) In G-S method of power flow problem, the number of iterations _____ depends on voltage control buses remains fixed depends on tolerance depends on no of buses depends on voltage control buses remains fixed depends on tolerance depends on no of buses ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In load flow analysis, the load at the bus is represented as a constant current drawn from the bus a constant impedance connected at the bus a voltag dependent impedance at the bus none of these a constant current drawn from the bus a constant impedance connected at the bus a voltag dependent impedance at the bus none of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The constraints that are to be met with while solving UC problem are Minimum down time Minimum up time Spinning reserve all are correct Minimum down time Minimum up time Spinning reserve all are correct ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) 100% string efficiency means Equal potential across each disc Zero potential across each disc One of the insulator discs shorted None uniform potential distribution across each disc Equal potential across each disc Zero potential across each disc One of the insulator discs shorted None uniform potential distribution across each disc ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Short circuit limit Transient stability limit Steady state limit Reactive power limit Short circuit limit Transient stability limit Steady state limit Reactive power limit ANSWER DOWNLOAD EXAMIANS APP