GETCO Exam Paper (22-07-2015) In G-S method of power flow problem, the number of iterations _____ depends on tolerance depends on no of buses remains fixed depends on voltage control buses depends on tolerance depends on no of buses remains fixed depends on voltage control buses ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In load flow analysis, the load at the bus is represented as a constant current drawn from the bus a voltag dependent impedance at the bus none of these a constant impedance connected at the bus a constant current drawn from the bus a voltag dependent impedance at the bus none of these a constant impedance connected at the bus ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The constraints that are to be met with while solving UC problem are Minimum up time all are correct Spinning reserve Minimum down time Minimum up time all are correct Spinning reserve Minimum down time ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) 100% string efficiency means Equal potential across each disc Zero potential across each disc None uniform potential distribution across each disc One of the insulator discs shorted Equal potential across each disc Zero potential across each disc None uniform potential distribution across each disc One of the insulator discs shorted ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Transient stability limit Short circuit limit Reactive power limit Steady state limit Transient stability limit Short circuit limit Reactive power limit Steady state limit ANSWER DOWNLOAD EXAMIANS APP