GETCO Exam Paper (22-07-2015) In G-S method of power flow problem, the number of iterations _____ depends on tolerance remains fixed depends on no of buses depends on voltage control buses depends on tolerance remains fixed depends on no of buses depends on voltage control buses ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In load flow analysis, the load at the bus is represented as a constant current drawn from the bus a constant impedance connected at the bus a voltag dependent impedance at the bus none of these a constant current drawn from the bus a constant impedance connected at the bus a voltag dependent impedance at the bus none of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The constraints that are to be met with while solving UC problem are Minimum up time all are correct Minimum down time Spinning reserve Minimum up time all are correct Minimum down time Spinning reserve ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) 100% string efficiency means None uniform potential distribution across each disc One of the insulator discs shorted Zero potential across each disc Equal potential across each disc None uniform potential distribution across each disc One of the insulator discs shorted Zero potential across each disc Equal potential across each disc ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Steady state limit Short circuit limit Reactive power limit Transient stability limit Steady state limit Short circuit limit Reactive power limit Transient stability limit ANSWER DOWNLOAD EXAMIANS APP