GETCO Exam Paper (22-07-2015) In G-S method of power flow problem, the number of iterations _____ depends on tolerance remains fixed depends on no of buses depends on voltage control buses depends on tolerance remains fixed depends on no of buses depends on voltage control buses ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In load flow analysis, the load at the bus is represented as none of these a voltag dependent impedance at the bus a constant impedance connected at the bus a constant current drawn from the bus none of these a voltag dependent impedance at the bus a constant impedance connected at the bus a constant current drawn from the bus ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The constraints that are to be met with while solving UC problem are Minimum down time all are correct Spinning reserve Minimum up time Minimum down time all are correct Spinning reserve Minimum up time ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) 100% string efficiency means None uniform potential distribution across each disc Equal potential across each disc One of the insulator discs shorted Zero potential across each disc None uniform potential distribution across each disc Equal potential across each disc One of the insulator discs shorted Zero potential across each disc ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Steady state limit Reactive power limit Transient stability limit Short circuit limit Steady state limit Reactive power limit Transient stability limit Short circuit limit ANSWER DOWNLOAD EXAMIANS APP