GETCO Exam Paper (22-07-2015) In G-S method of power flow problem, the number of iterations _____ depends on tolerance remains fixed depends on no of buses depends on voltage control buses depends on tolerance remains fixed depends on no of buses depends on voltage control buses ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In load flow analysis, the load at the bus is represented as none of these a constant current drawn from the bus a voltag dependent impedance at the bus a constant impedance connected at the bus none of these a constant current drawn from the bus a voltag dependent impedance at the bus a constant impedance connected at the bus ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The constraints that are to be met with while solving UC problem are all are correct Minimum down time Minimum up time Spinning reserve all are correct Minimum down time Minimum up time Spinning reserve ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) 100% string efficiency means Equal potential across each disc One of the insulator discs shorted None uniform potential distribution across each disc Zero potential across each disc Equal potential across each disc One of the insulator discs shorted None uniform potential distribution across each disc Zero potential across each disc ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Reactive power limit Short circuit limit Steady state limit Transient stability limit Reactive power limit Short circuit limit Steady state limit Transient stability limit ANSWER DOWNLOAD EXAMIANS APP