GETCO Exam Paper (22-07-2015) In G-S method of power flow problem, the number of iterations _____ depends on tolerance depends on no of buses remains fixed depends on voltage control buses depends on tolerance depends on no of buses remains fixed depends on voltage control buses ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In load flow analysis, the load at the bus is represented as a constant impedance connected at the bus a voltag dependent impedance at the bus a constant current drawn from the bus none of these a constant impedance connected at the bus a voltag dependent impedance at the bus a constant current drawn from the bus none of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The constraints that are to be met with while solving UC problem are all are correct Minimum up time Spinning reserve Minimum down time all are correct Minimum up time Spinning reserve Minimum down time ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) 100% string efficiency means One of the insulator discs shorted Equal potential across each disc None uniform potential distribution across each disc Zero potential across each disc One of the insulator discs shorted Equal potential across each disc None uniform potential distribution across each disc Zero potential across each disc ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Steady state limit Reactive power limit Short circuit limit Transient stability limit Steady state limit Reactive power limit Short circuit limit Transient stability limit ANSWER DOWNLOAD EXAMIANS APP