Process Equipment and Plant Design Friction factor for turbulent flow in a new pipe is given by f = 0.22 NRe0.05 f = 0.04/NRe0.16 f = 16/NRe f = 25/NRe f = 0.22 NRe0.05 f = 0.04/NRe0.16 f = 16/NRe f = 25/NRe ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The force due to wind load acting on a tall vessel depends upon its Outside diameter Shape Height All of these Outside diameter Shape Height All of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a thin cylindrical shell, the hoop stress is __________ stress. Compressive Longitudinal Circumferential tensile Radial Compressive Longitudinal Circumferential tensile Radial ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The ratio of tube length to shell diameter in case of liquid shell and tube heat exchanger ranges from 4 to 8 3 to 5 6 to 12 2 to 3 4 to 8 3 to 5 6 to 12 2 to 3 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about __________ mm of water column per metre height of packing. 20-40 1000-1500 43835 100-150 20-40 1000-1500 43835 100-150 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Steam is preferred to be used as a heating medium in heat exchangers, because of its High latent heat Non-corrosive condensate Low cost High film co-efficient High latent heat Non-corrosive condensate Low cost High film co-efficient ANSWER DOWNLOAD EXAMIANS APP