Power Systems For complete protection of 3-phase system from the short circuit faults minimum number of relays required are three one two six three one two six ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 100 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 10 MW 15 MW 20 MW 80 MW 10 MW 15 MW 20 MW 80 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Characteristics of arc quenching medium is/are High dielectric strength All of these Non flammable High thermal conductivity High dielectric strength All of these Non flammable High thermal conductivity ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is not a secondary nuclear fuel None of above. U235. Pu239. U233. None of above. U235. Pu239. U233. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rate of rise of restricting voltage depends upon the Inductance of the system. Type of CB. Capacitance of the system. Inductance and capacitance of the system. Inductance of the system. Type of CB. Capacitance of the system. Inductance and capacitance of the system. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants operating cost is low and initial cost is high. both operating and initial cost are low. both operating and initial cost are high. operating cost is high and initial cost is low. operating cost is low and initial cost is high. both operating and initial cost are low. both operating and initial cost are high. operating cost is high and initial cost is low. ANSWER DOWNLOAD EXAMIANS APP