• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Power Systems

Power Systems
For complete protection of 3-phase system from the short circuit faults minimum number of relays required are

 three
 one
 six
 two

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Zero sequence currents can flow from a line into a transformer bank if the windings are in

 star / grounded star.
  ground star / delta.
 delta / delta.
 delta / star.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The neutral of 10 MVA, 11 kV alternator is earthed through a resistance of 5 ohms. The fault ready is set to operate at 0.75 A. The current transformers have a ratio of 1000/5. What is the percentage of the alternator winding is protected?

 11.8%
 15%
 85%
 88.2%

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The overall efficiency of a steam power plant equal to

 the Rankine cycle.
  product of boiler efficiency, turbine efficiency and generator efficiency.
 binary vapor cycle.
 regenerative cycle.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The shape of the disc of an induction disc relay is

  spiral.
  elliptical.
  none of these.
  circular.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The annual depreciation of hydro power plant is about

 15 - 20 %.
  0.5 - 1.5 %.
 10 - 15 %.
 20 - 25 %.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑