Power Systems For complete protection of 3-phase system from the short circuit faults minimum number of relays required are one six three two one six three two ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants operating cost is high and initial cost is low. both operating and initial cost are high. both operating and initial cost are low. operating cost is low and initial cost is high. operating cost is high and initial cost is low. both operating and initial cost are high. both operating and initial cost are low. operating cost is low and initial cost is high. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the number of strands of ACSR conductor for 4 layer transmission line? 37 7 1 29 37 7 1 29 ANSWER DOWNLOAD EXAMIANS APP
Power Systems For symmetrical network, the neutral current is any of the above zero infinity maximum any of the above zero infinity maximum ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of gauss siedel method is/are All of these number of iterations are less calculation time for each iteration is less applicable for large power system network All of these number of iterations are less calculation time for each iteration is less applicable for large power system network ANSWER DOWNLOAD EXAMIANS APP
Power Systems Radio interference occur in telecommunication line due to electro magnetic induction electro static induction both 1 and 2 nether 1 nor 2 electro magnetic induction electro static induction both 1 and 2 nether 1 nor 2 ANSWER DOWNLOAD EXAMIANS APP