Environmental Engineering For a country like India, where rainfall is mainly confined to one season, the suitable sewerage system will be Combined system Partially separate system Separate system Partially combined system Combined system Partially separate system Separate system Partially combined system ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Generally the detention period for grit chambers is kept as 1 minute 5 minutes 24 hours 12 hours 1 minute 5 minutes 24 hours 12 hours ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering As compared to higher pH values, the contact period required for efficient chlorination at lower pH values is Smaller Larger None of these Same Smaller Larger None of these Same ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering If the coli form bacteria is present in a sample of water, then the coli-form test to be conducted is (i) Presumptive coli-form test (ii) Confirmed coli-form test (iii) Completed coli-form test Both (i) and (ii) Only (i) All (i), (ii) and (iii) Both (i) and (iii) Both (i) and (ii) Only (i) All (i), (ii) and (iii) Both (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The main disadvantage of oxidation pond is that BOD removal is very low None of these Maintenance and operation cost are high Large area is required for construction BOD removal is very low None of these Maintenance and operation cost are high Large area is required for construction ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The rate of filtration in slow sand filters in million litres per day per hectare is about 500 to 600 50 to 60 1400 to 1500 100 to 150 500 to 600 50 to 60 1400 to 1500 100 to 150 ANSWER DOWNLOAD EXAMIANS APP