Waste Water Engineering Facultative bacteria survive in Both cases A and B The absence of oxygen Neither A nor B The presence of oxygen Both cases A and B The absence of oxygen Neither A nor B The presence of oxygen ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewers Must flow under gravity ½ to ¾ full All listed here Must be of adequate size to avoid over flow Must be laid at least 2 to 3 m deep to collect /water from the basements Must flow under gravity ½ to ¾ full All listed here Must be of adequate size to avoid over flow Must be laid at least 2 to 3 m deep to collect /water from the basements ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In case of Imhoff tanks, All of these The velocity of flow is restricted to 0.30 m/minute The shape is rectangular Detention period is 2 hours All of these The velocity of flow is restricted to 0.30 m/minute The shape is rectangular Detention period is 2 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The recommended detention period for grit chambers is 2 minutes 5 minutes 3 minutes 1 minute 2 minutes 5 minutes 3 minutes 1 minute ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Clogging of sewers, is caused due to Silting All of these Low discharge Greasy and oily matters Silting All of these Low discharge Greasy and oily matters ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering It is customary to design a sewer for D.W.F. on the basis of Four times the average demand Twice the average demand Average demand Thrice the average demand Four times the average demand Twice the average demand Average demand Thrice the average demand ANSWER DOWNLOAD EXAMIANS APP