Waste Water Engineering Facultative bacteria survive in Both cases A and B Neither A nor B The presence of oxygen The absence of oxygen Both cases A and B Neither A nor B The presence of oxygen The absence of oxygen ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Drop manholes at the junctions of sewer lines, are provided if Ordinary manhole cannot be built Two sewer lines intersect Invert level of a branch sewer is more than 60 cm that of the main sewer Sewer line runs along a main road Ordinary manhole cannot be built Two sewer lines intersect Invert level of a branch sewer is more than 60 cm that of the main sewer Sewer line runs along a main road ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The digested sludge from septic tanks, is removed after a maximum period of 3 years 5 years 4 years 3.5 years 3 years 5 years 4 years 3.5 years ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of bars of perforations of fine screens used for the treatment of sewage, is 5 to 8 mm 8 to 10 mm 2 to 3 mm 3 to 5 mm 5 to 8 mm 8 to 10 mm 2 to 3 mm 3 to 5 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum diameter of sewers adopted in the designs is 2.0 m 3.0 m 1.0 m 4.0 m 2.0 m 3.0 m 1.0 m 4.0 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A rain sanitary sewer is constructed to carry Storm sewage Ground water Surface water Sanitary sewage Storm sewage Ground water Surface water Sanitary sewage ANSWER DOWNLOAD EXAMIANS APP