Environmental Engineering Which of the following methods of analysis of water distribution system is most suitable for long and narrow pipe system? Equivalent pipe method Circle method Hardy cross method Electrical analysis method Equivalent pipe method Circle method Hardy cross method Electrical analysis method ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The detention period in coagulation tanks is usually kept as 2 to 6 hours 2 to 6 days 30 to 45 minutes 1 to 2 minutes 2 to 6 hours 2 to 6 days 30 to 45 minutes 1 to 2 minutes ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The detention period for oxidation ponds is usually kept as 3 months 24 hours 48 hours 10 to 15 days 3 months 24 hours 48 hours 10 to 15 days ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering If the sewage contains grease and fatty oils, these are removed in Skimming tanks Detritus tanks Grit chambers Sedimentation tanks Skimming tanks Detritus tanks Grit chambers Sedimentation tanks ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The design discharge for the separate sewer system shall be taken as 3 × DWF 6 × DWF 2 × DWF Equal to dry weather flow (DWF) 3 × DWF 6 × DWF 2 × DWF Equal to dry weather flow (DWF) ANSWER DOWNLOAD EXAMIANS APP