Environmental Engineering Which of the following methods of analysis of water distribution system is most suitable for long and narrow pipe system? Electrical analysis method Hardy cross method Equivalent pipe method Circle method Electrical analysis method Hardy cross method Equivalent pipe method Circle method ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The detention period in coagulation tanks is usually kept as 2 to 6 hours 1 to 2 minutes 2 to 6 days 30 to 45 minutes 2 to 6 hours 1 to 2 minutes 2 to 6 days 30 to 45 minutes ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The detention period for oxidation ponds is usually kept as 10 to 15 days 3 months 48 hours 24 hours 10 to 15 days 3 months 48 hours 24 hours ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering If the sewage contains grease and fatty oils, these are removed in Skimming tanks Detritus tanks Sedimentation tanks Grit chambers Skimming tanks Detritus tanks Sedimentation tanks Grit chambers ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The design discharge for the separate sewer system shall be taken as Equal to dry weather flow (DWF) 6 × DWF 2 × DWF 3 × DWF Equal to dry weather flow (DWF) 6 × DWF 2 × DWF 3 × DWF ANSWER DOWNLOAD EXAMIANS APP