Environmental Engineering Which of the following methods of analysis of water distribution system is most suitable for long and narrow pipe system? Electrical analysis method Circle method Hardy cross method Equivalent pipe method Electrical analysis method Circle method Hardy cross method Equivalent pipe method ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The detention period in coagulation tanks is usually kept as 2 to 6 days 2 to 6 hours 30 to 45 minutes 1 to 2 minutes 2 to 6 days 2 to 6 hours 30 to 45 minutes 1 to 2 minutes ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The detention period for oxidation ponds is usually kept as 24 hours 10 to 15 days 48 hours 3 months 24 hours 10 to 15 days 48 hours 3 months ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering If the sewage contains grease and fatty oils, these are removed in Detritus tanks Skimming tanks Sedimentation tanks Grit chambers Detritus tanks Skimming tanks Sedimentation tanks Grit chambers ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The design discharge for the separate sewer system shall be taken as 2 × DWF 6 × DWF 3 × DWF Equal to dry weather flow (DWF) 2 × DWF 6 × DWF 3 × DWF Equal to dry weather flow (DWF) ANSWER DOWNLOAD EXAMIANS APP