Environmental Engineering The detention period in coagulation tanks is usually kept as 30 to 45 minutes 1 to 2 minutes 2 to 6 hours 2 to 6 days 30 to 45 minutes 1 to 2 minutes 2 to 6 hours 2 to 6 days ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Chlorine demand of water is equal to Sum of applied and residual chlorine Difference of applied and residual chlorine Residual chlorine Applied chlorine Sum of applied and residual chlorine Difference of applied and residual chlorine Residual chlorine Applied chlorine ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The method of analysis of distribution system in which the domestic supply is neglected and fire demand is considered is Hardy cross method Equivalent pipe method Electrical analysis method Circle method Hardy cross method Equivalent pipe method Electrical analysis method Circle method ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The length of rectangular sedimentation tank should not be more than (Where ‘B’ is the width of the tank) 2B B 8B 4B 2B B 8B 4B ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The means of access for inspection and cleaning of sewer line is known as Manhole Inlet Catch basin Drop manhole Manhole Inlet Catch basin Drop manhole ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The maximum discharge of a tube well is about 1000 liters/sec 500 liters/sec 5 liters/sec 50 liters/sec 1000 liters/sec 500 liters/sec 5 liters/sec 50 liters/sec ANSWER DOWNLOAD EXAMIANS APP