Environmental Engineering Hardy cross method of analysis of distribution system (i) Involves successive trials (ii) Takes economic aspects into account (iii) Is time consuming Only (i) (i) and (ii) (i) and (iii) All are correct Only (i) (i) and (ii) (i) and (iii) All are correct ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The treatment of water with bleaching powder is known as Super chlorination De-chlorination Hypo-chlorination Pre-chlorination Super chlorination De-chlorination Hypo-chlorination Pre-chlorination ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering A pipe which is installed in the house drainage to preserve the water seal of traps is called Vent pipe Waste pipe Anti-siphonage pipe Soil pipe Vent pipe Waste pipe Anti-siphonage pipe Soil pipe ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering When there is no recirculation of sewage, then recirculation factor is Infinity None of these 1 Infinity None of these 1 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Generally the detention period for grit chambers is kept as 1 minute 12 hours 5 minutes 24 hours 1 minute 12 hours 5 minutes 24 hours ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The type of valve which allows water to flow in one direction but prevents its flow in the reverse direction is Pressure relief valve Air relief valve Sluice valve Reflux valve Pressure relief valve Air relief valve Sluice valve Reflux valve ANSWER DOWNLOAD EXAMIANS APP