Environmental Engineering The distribution mains are designed for Maximum daily demand Maximum hourly demand Maximum hourly demand on maximum day Average daily demand Maximum daily demand Maximum hourly demand Maximum hourly demand on maximum day Average daily demand ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Period of cleaning of slow sand filters is about 24 - 48 hours 2 - 3 months 10 - 12 days 1 - 2 year 24 - 48 hours 2 - 3 months 10 - 12 days 1 - 2 year ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The suitable layout of a distribution system for irregularly growing town is Grid iron system Dead end system Ring system Radial system Grid iron system Dead end system Ring system Radial system ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Sewerage system is designed for Average flow only Maximum and minimum flow Minimum flow only Maximum flow only Average flow only Maximum and minimum flow Minimum flow only Maximum flow only ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering For the same solid content, if the quantity of sludge with moisture content of 98% is X, then the quantity of sludge with moisture content of 96% will be X/4 X/2 2X X X/4 X/2 2X X ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering In chlorination, with the rise in temperature of water, death rate of bacteria None of these Remains unaffected Decreases Increases None of these Remains unaffected Decreases Increases ANSWER DOWNLOAD EXAMIANS APP