Environmental Engineering The distribution mains are designed for Maximum hourly demand Maximum hourly demand on maximum day Average daily demand Maximum daily demand Maximum hourly demand Maximum hourly demand on maximum day Average daily demand Maximum daily demand ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The maximum efficiency of BOD removal is achieved in Oxidation ditch Aerated lagoons Oxidation pond Trickling filters Oxidation ditch Aerated lagoons Oxidation pond Trickling filters ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Laying of sewers is usually done with the help of A Theodolite A plane table Sight rails and boning rods A compass A Theodolite A plane table Sight rails and boning rods A compass ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering If the average daily consumption of a city is 100,000 m³, the maximum daily consumption on peak hourly demand will be 100000 m³ 150000 m³ 270000 m³ 180000 m³ 100000 m³ 150000 m³ 270000 m³ 180000 m³ ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The major disadvantage of lime soda process of water softening is that Huge amount of precipitate is formed which creates a disposal problem It is unsuitable for turbid and acidic water It is unsuitable for softening the water of excessive hardness The effluent cannot be reduced to zero hardness Huge amount of precipitate is formed which creates a disposal problem It is unsuitable for turbid and acidic water It is unsuitable for softening the water of excessive hardness The effluent cannot be reduced to zero hardness ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The overflow rate for plain sedimentation tanks is about 1250 to 1500 liters/hour/m² 1500 to 2000 liters/hour/m² 1000 to 1250 liters/hour/ m² 500 to 750 liters/hour/ m² 1250 to 1500 liters/hour/m² 1500 to 2000 liters/hour/m² 1000 to 1250 liters/hour/ m² 500 to 750 liters/hour/ m² ANSWER DOWNLOAD EXAMIANS APP