Environmental Engineering The design discharge for the separate sewer system shall be taken as 6 × DWF Equal to dry weather flow (DWF) 3 × DWF 2 × DWF 6 × DWF Equal to dry weather flow (DWF) 3 × DWF 2 × DWF ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The process in which the chlorination is done beyond the break point is known as Break point chlorination Pre-chlorination Super chlorination Post chlorination Break point chlorination Pre-chlorination Super chlorination Post chlorination ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Laying of sewers is usually done with the help of Sight rails and boning rods A Theodolite A compass A plane table Sight rails and boning rods A Theodolite A compass A plane table ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The maximum discharge of a tube well is about 500 liters/sec 5 liters/sec 1000 liters/sec 50 liters/sec 500 liters/sec 5 liters/sec 1000 liters/sec 50 liters/sec ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The depression of water table in a well due to pumping will be maximum(Where ‘R’ is the radius of influence) At a distance R from the well Close to the well At a distance R/2 from the well None of these At a distance R from the well Close to the well At a distance R/2 from the well None of these ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Generally the detention period for grit chambers is kept as 12 hours 5 minutes 24 hours 1 minute 12 hours 5 minutes 24 hours 1 minute ANSWER DOWNLOAD EXAMIANS APP