Environmental Engineering The design discharge for the separate sewer system shall be taken as 2 × DWF 3 × DWF 6 × DWF Equal to dry weather flow (DWF) 2 × DWF 3 × DWF 6 × DWF Equal to dry weather flow (DWF) ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The detention period and overflow rate respectively for plain sedimentation as compared to sedimentation with coagulation are generally Less and more Less and less More and less More and more Less and more Less and less More and less More and more ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The layout of distribution system in which water flows towards the outer periphery is Grid iron system Ring system Radial system Dead end system Grid iron system Ring system Radial system Dead end system ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The overflow rate for plain sedimentation tanks is about 1500 to 2000 liters/hour/m² 1000 to 1250 liters/hour/ m² 1250 to 1500 liters/hour/m² 500 to 750 liters/hour/ m² 1500 to 2000 liters/hour/m² 1000 to 1250 liters/hour/ m² 1250 to 1500 liters/hour/m² 500 to 750 liters/hour/ m² ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The maximum efficiency of BOD removal is achieved in Oxidation pond Oxidation ditch Aerated lagoons Trickling filters Oxidation pond Oxidation ditch Aerated lagoons Trickling filters ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Residual chlorine in water is determined by None of these Starch iodide method Orthotolidine method Both (A) and (B) None of these Starch iodide method Orthotolidine method Both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP