Environmental Engineering The design discharge for the separate sewer system shall be taken as Equal to dry weather flow (DWF) 3 × DWF 2 × DWF 6 × DWF Equal to dry weather flow (DWF) 3 × DWF 2 × DWF 6 × DWF ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The process in which the chlorination is done beyond the break point is known as Post chlorination Pre-chlorination Super chlorination Break point chlorination Post chlorination Pre-chlorination Super chlorination Break point chlorination ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The self cleansing velocity for all sewers in India is usually 3.0 m/sec to 3.5 m/sec 1.5 m/sec to 2.0 m/sec Less than 1.0 m/sec 1.0 m/sec to 1.2 m/sec 3.0 m/sec to 3.5 m/sec 1.5 m/sec to 2.0 m/sec Less than 1.0 m/sec 1.0 m/sec to 1.2 m/sec ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The rate of filtration in slow sand filters in million litres per day per hectare is about 50 to 60 1400 to 1500 500 to 600 100 to 150 50 to 60 1400 to 1500 500 to 600 100 to 150 ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The maximum efficiency of BOD removal is achieved in Oxidation pond Oxidation ditch Aerated lagoons Trickling filters Oxidation pond Oxidation ditch Aerated lagoons Trickling filters ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Most suitable section of sewer in separate sewage system is Rectangular section Circular section Modified egg shaped section Standard form of egg shaped sewer Rectangular section Circular section Modified egg shaped section Standard form of egg shaped sewer ANSWER DOWNLOAD EXAMIANS APP