The detention period for oxidation ponds is usually kept as

3 months
10 to 15 days
24 hours
48 hours

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
The correct relation between theoretical oxygen demand (TOD), Biochemical oxygen demand (BOD) and Chemical oxygen demand (COD) is given by

TOD > BOD > COD
COD > BOD > TOD
BOD > COD > TOD
TOD > COD > BOD

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
The process of lagooning is primarily a means of

Reducing the excessive flow in sewers
Increasing the capacity of storage reservoirs
Disposing of sludge
Increasing flow of sewage through imhoff tanks

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
If Biochemical oxygen demand (BOD) of a town is 20000 kg/day and BOD per capita per day is 0.05 kg, then population equivalent of town is

1,00,000
4000
4,00,000
1000

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
The most commonly used sewer under culverts is

Circular cast iron sewer
Horseshoe type sewer
Circular brick sewer
Semi-elliptical sewer

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
The maximum efficiency of BOD removal is achieved in

Oxidation ditch
Trickling filters
Oxidation pond
Aerated lagoons

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Environmental Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑