Waste Water Engineering Design period of 40 to 50 years is adopted for Trunk sewers All listed here Branch sewers Main sewers Trunk sewers All listed here Branch sewers Main sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Disposal to sewage in large cities, is done in Purification Dilution Irrigation Oxidation Purification Dilution Irrigation Oxidation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The formula V = (1/n) r2/3 Manning’s formula Kutter’s formula Chezy’s formula Bazin’s formula Manning’s formula Kutter’s formula Chezy’s formula Bazin’s formula ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a fully mechanised composting plant, involves Mechanized pulverising of refuse Mechanized receipt Mechanized segregation All of these Mechanized pulverising of refuse Mechanized receipt Mechanized segregation All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For evaporation and measurement of settable solids, the apparatus used, is A test tube An Imhoff cone A breaker A jar A test tube An Imhoff cone A breaker A jar ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The non-clog pump which permits solid matter to pass out with the liquid sewage, is Centrifugal pump None of these Pneumatic ejector Reciprocating pump Centrifugal pump None of these Pneumatic ejector Reciprocating pump ANSWER DOWNLOAD EXAMIANS APP