Waste Water Engineering Design period of 40 to 50 years is adopted for Main sewers All listed here Trunk sewers Branch sewers Main sewers All listed here Trunk sewers Branch sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewers designed with self cleansing velocity, Neither silting nor scouring occurs at the bottom The bottom is silted Both silting and scouring occur at the bottom The bottom is scoured Neither silting nor scouring occurs at the bottom The bottom is silted Both silting and scouring occur at the bottom The bottom is scoured ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For trunk and out-fall, the type of sewers generally used, is Standard egg shaped Parabolic shaped Circular shaped Horse shoe shaped Standard egg shaped Parabolic shaped Circular shaped Horse shoe shaped ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer pipes need be checked for Minimum flow Both A and B Maximum flow None of these Minimum flow Both A and B Maximum flow None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer that unloads the sewage at the point of treatment is called House sewer Branch sewer Outfall sewer Main sewer House sewer Branch sewer Outfall sewer Main sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the length of overland flow from the critical point to the mouth of drain is 13.58 km and difference in level between the critical point and drain mouth is 10 m, the inlet time is 4 hours 8 hours 6 hours 2 hours 4 hours 8 hours 6 hours 2 hours ANSWER DOWNLOAD EXAMIANS APP