Waste Water Engineering In case of sewer lines Test for straightness is carried out with the help of a lamp and mirror Obstruction test is carried out with the help of smooth ball of diameter 13 mm All listed here Water test is carried out to check water tightness of the joints Test for straightness is carried out with the help of a lamp and mirror Obstruction test is carried out with the help of smooth ball of diameter 13 mm All listed here Water test is carried out to check water tightness of the joints ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for Unexpected large scale infiltration of stream water All of these Unexpected increase in the population Under estimates of maximum and average flows Unexpected large scale infiltration of stream water All of these Unexpected increase in the population Under estimates of maximum and average flows ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a continuous flow type of sedimentation tanks Width of the tank is normally kept about 6 m Maximum horizontal flow velocity is limited to 0.3 m/minute Length of the tank is normally kept 4 to 5 times the width All listed here Width of the tank is normally kept about 6 m Maximum horizontal flow velocity is limited to 0.3 m/minute Length of the tank is normally kept 4 to 5 times the width All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for A particle to travel along its length The flow of sewage to fill the tank A particle to travel from top surface to bottom sludge zone None of these A particle to travel along its length The flow of sewage to fill the tank A particle to travel from top surface to bottom sludge zone None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For design of sewers, percentage of sewage discharge is assumed 70 to 75% 65 to 70% 75 to 80% 0.85 70 to 75% 65 to 70% 75 to 80% 0.85 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Aerobic activity is maximum At sewer pipes In sewer treatment plants None of these In freshly produced sewage At sewer pipes In sewer treatment plants None of these In freshly produced sewage ANSWER DOWNLOAD EXAMIANS APP