Waste Water Engineering In case of sewer lines Obstruction test is carried out with the help of smooth ball of diameter 13 mm All listed here Test for straightness is carried out with the help of a lamp and mirror Water test is carried out to check water tightness of the joints Obstruction test is carried out with the help of smooth ball of diameter 13 mm All listed here Test for straightness is carried out with the help of a lamp and mirror Water test is carried out to check water tightness of the joints ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is 5.5 m 5 m 7 m 6.5 m 5.5 m 5 m 7 m 6.5 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The self-cleansing velocity of water flowing through pipe lines, is 2 metres/sec 1 metre/sec 0.25 metre/sec 0.5 metre/sec 2 metres/sec 1 metre/sec 0.25 metre/sec 0.5 metre/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Chlorination of water is done for the removal of Hardness Sediments Bacterias Suspended solids Hardness Sediments Bacterias Suspended solids ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the over land flow from the critical point to the drain is 8 km and the difference in level is 12.4 m, the inlet time is 3 hours 5 hours 4 hours 2 hours 3 hours 5 hours 4 hours 2 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering When drainage to sewage ratio is 20, the peak dry weather flow is Slightly more than 5% of the design discharge Slightly less than 5% of the design discharge 20% of the design discharge None of these Slightly more than 5% of the design discharge Slightly less than 5% of the design discharge 20% of the design discharge None of these ANSWER DOWNLOAD EXAMIANS APP