Power Systems Demand factor of a plant is 0 greater than 1 1 less than 1 0 greater than 1 1 less than 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following are the fissile materials None of these. U235 and Th239. U238 and Th232. U235, U233 and Pu239. None of these. U235 and Th239. U238 and Th232. U235, U233 and Pu239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Phase shift occurs due to which of the following components? conductance inductance capacitance both 1 and 2 conductance inductance capacitance both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The overall efficiency of a steam power plant equal to product of boiler efficiency, turbine efficiency and generator efficiency. the Rankine cycle. regenerative cycle. binary vapor cycle. product of boiler efficiency, turbine efficiency and generator efficiency. the Rankine cycle. regenerative cycle. binary vapor cycle. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Y bus matrix of 100 bus interconnected system is 90% sparse. Hence the number of transmission lines in the system must be 450 900 250 500 450 900 250 500 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Electrostatic precipitators in thermal power plants are used for removal of ash from flue gas control flow rate All of these remove moisture from the cole removal of ash from flue gas control flow rate All of these remove moisture from the cole ANSWER DOWNLOAD EXAMIANS APP