Power Systems A loss less transmission line has a length of 600 km, find the phase shift of voltage signal? 45° 90° 36° 42° 45° 90° 36° 42° ANSWER DOWNLOAD EXAMIANS APP
Power Systems Deaerative heating is done to remove dissolved. heat the feed water. heat the steam. remove dissolved gases in water. remove dissolved. heat the feed water. heat the steam. remove dissolved gases in water. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j3 pu j6 pu j1 pu j9 pu j3 pu j6 pu j1 pu j9 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The insulation of the modern EHV lines is designed based on the switch voltage. R × I. the lighting voltage. corona. the switch voltage. R × I. the lighting voltage. corona. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The maximum demand of a consumer is 2 kW and corresponding daily energy consumption is 30 units. What is the corresponding load factor? 50.5% 25% 75% 62.5% 50.5% 25% 75% 62.5% ANSWER DOWNLOAD EXAMIANS APP
Power Systems By using guard ring in a transmission line, its string efficiency None of these decrease remains unaffected increase None of these decrease remains unaffected increase ANSWER DOWNLOAD EXAMIANS APP