Power Systems

Power Systems
A loss less transmission line has a length of 600 km, find the phase shift of voltage signal?

 36°
 45°
 90°
 42°

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The method of neutral grounding affects the

 negative sequence network
All of these
 positive sequence network
 zero sequence network

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In an induction relay for a particular current setting the operating time 4 sec. When the time multiplier setting is 0.8 if the time multiplier setting is rest to 1 the operating time is

 5.
  un changed.
  1.
 10.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The use of high speed circuit breakers

 decrease system stability.
 increased the short circuit current.
 reduces the short circuit current.
  improves system stability.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Rankine cycle efficiency of a steam power plant is of

  30 - 45 %.
  45 - 80 %.
  60 - 80 %.
  20 - 30 %.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The essential requirement(s) for power plants to be operated as peak load plants are

 Low capital cost.
 Capability of quick starts.
 Quick response to load variation.
All of these

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑