Building Construction Crown is located at Highest point on the extrados of the arch Highest point on the intrados of the arch None of these Skew-back of the arch Highest point on the extrados of the arch Highest point on the intrados of the arch None of these Skew-back of the arch ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of concrete bed of the foundation depends upon The mix of the concrete All listed here The upward soil pressure The projection of the concrete block beyond the footing over it The mix of the concrete All listed here The upward soil pressure The projection of the concrete block beyond the footing over it ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement made to support an unsafe structure temporarily, is known as Scaffolding Shoring Jacking Underpinning Scaffolding Shoring Jacking Underpinning ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of arch used for high class buildings where appearance is of prime importance, is known as Ashlar arch Gauged brick arch Axed brick arch Rubble arch Ashlar arch Gauged brick arch Axed brick arch Rubble arch ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: All listed here A flap valve at the bottom of tube is provided to extract the soil sample The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here A flap valve at the bottom of tube is provided to extract the soil sample The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge ANSWER DOWNLOAD EXAMIANS APP
Building Construction The rock formed from the solidification of molten matter (magma) is called: Igneous rock Sedimentary rock None of these Metamorphic rock Igneous rock Sedimentary rock None of these Metamorphic rock ANSWER DOWNLOAD EXAMIANS APP