Building Construction
Crown is located at

Highest point on the extrados of the arch
None of these
Highest point on the intrados of the arch
Skew-back of the arch

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Which one of the following activities is not correct as applicable to brick corbels

The maximum projection of the corbel should not be more than the thickness of the wall
The discontinuous corbels are used to carry heavy concentrated loads
Stretcher bond is generally used for the construction of brick corbel
The maximum projection of each corbel course should be limited to a quarter brick at a time