Crown is located at

Skew-back of the arch
Highest point on the intrados of the arch
None of these
Highest point on the extrados of the arch

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Grillage foundation

All listed here
Does not require deep cutting as the required base area with required pressure intensity is obtained at a shallow depth
Is light and economical
Is used to transfer heavy structural loads from steel columns to a soil having low bearing capacity