Process Equipment and Plant Design Column support for the roof of cylindrical storage tank must be provided for All of these Small diameter tanks Small diameter tall tanks Large diameter tanks All of these Small diameter tanks Small diameter tall tanks Large diameter tanks ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Vertical storage vessels are never supported by __________ support. Bracket Skirt Lug Saddle Bracket Skirt Lug Saddle ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Le/D for fully open globe value may be around 10 25 300 75 10 25 300 75 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design LMTD correction factor is used in heat exchanger design for Counter flow of hot and cold fluids Fouling fluids Double pipe heat exchanger Multipass shell and tube heat exchanger Counter flow of hot and cold fluids Fouling fluids Double pipe heat exchanger Multipass shell and tube heat exchanger ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Diameter of the seive tray column is determined by the Lower limit of vapour velocity Height of the plate spacing Hole diameter of the seive tray Upper limit of the vapour velocity Lower limit of vapour velocity Height of the plate spacing Hole diameter of the seive tray Upper limit of the vapour velocity ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Pick out the wrong statement about routing of fluids in a shell and tube heat exchanger. The corrosive and fouling fluid should be preferably routed through the tubes Higher pressure fluid stream should be routed through the shell side Lower flow rate fluid should be routed through the shell side The viscous fluid should be routed through the shell side The corrosive and fouling fluid should be preferably routed through the tubes Higher pressure fluid stream should be routed through the shell side Lower flow rate fluid should be routed through the shell side The viscous fluid should be routed through the shell side ANSWER DOWNLOAD EXAMIANS APP