Waste Water Engineering Cement concrete sewers are only suitable if non-scouring velocity is between 3.0 to 4.0 m/sec 4.5 to 5.5 m/sec 3.5 to 4.5 m/sec 2.5 to 3.0 m/sec 3.0 to 4.0 m/sec 4.5 to 5.5 m/sec 3.5 to 4.5 m/sec 2.5 to 3.0 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering depends upon The Chezy’s constant C in the formula V = C Size of the sewer Roughness of sewer surface Shape of the sewer All listed here Size of the sewer Roughness of sewer surface Shape of the sewer All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The clarigesters are Circular Imhoff double storey tanks without bottom hoppers Circular septic tanks Rectangular septic tanks Circular Imhoff double tanks with bottom hoppers Circular Imhoff double storey tanks without bottom hoppers Circular septic tanks Rectangular septic tanks Circular Imhoff double tanks with bottom hoppers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a fully mechanised composting plant, involves All of these Mechanized receipt Mechanized pulverising of refuse Mechanized segregation All of these Mechanized receipt Mechanized pulverising of refuse Mechanized segregation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In areas where rainy season is limited to a few months, the type of sewerage system recommended is Partially separate system Separate system None of these Combined system Partially separate system Separate system None of these Combined system ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The flow velocity in detritus tanks is None of these 0.05 m/sec 0.09 m/sec 1.25 m/sec None of these 0.05 m/sec 0.09 m/sec 1.25 m/sec ANSWER DOWNLOAD EXAMIANS APP