Waste Water Engineering The maximum diameter of sewers adopted in the designs is 2.0 m 3.0 m 1.0 m 4.0 m 2.0 m 3.0 m 1.0 m 4.0 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is d (0.022d + 0.085H)/Q d (0.285d + 0.011H)/Q d² (0.011d + 0.785H)/Q d (0.785d + 0.011H)/Q d (0.022d + 0.085H)/Q d (0.285d + 0.011H)/Q d² (0.011d + 0.785H)/Q d (0.785d + 0.011H)/Q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering pH value of sludge during alkaline regression stage, is More than 6 Less than 6 Less than 7 More than 7 More than 6 Less than 6 Less than 7 More than 7 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewage treatment in septic tanks is due to Anaerobic decomposition Parasitic decomposition None of these Aerobic decomposition Anaerobic decomposition Parasitic decomposition None of these Aerobic decomposition ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For large sewers, maximum distance between manholes may be 300 m 100 m 200 m 50 m 300 m 100 m 200 m 50 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 5 days-biochemical oxygen demand (BOD5) is taken at a temperature of 15°C 0°C 20°C 25°C 15°C 0°C 20°C 25°C ANSWER DOWNLOAD EXAMIANS APP