Surveying After fixing the plane table to the tripod, the main operations which are needed at each plane table station are(i) Levelling(ii) Orientation(iii) CenteringThe correct sequence of these operations is (ii), (iii), (i) (i), (iii), (ii) (i), (ii), (iii) (iii), (i), (ii) (ii), (iii), (i) (i), (iii), (ii) (i), (ii), (iii) (iii), (i), (ii) ANSWER DOWNLOAD EXAMIANS APP
Surveying From the principal point the horizon point lies on the principal line at a distance of f cos θ f sin θ f tan θ f cot θ f cos θ f sin θ f tan θ f cot θ ANSWER DOWNLOAD EXAMIANS APP
Surveying Pick up the incorrect statement from the following. The angular distance of heavenly bodies on observer's meridian measured from the pole, is Co-altitude Polar distance Co-declination Co-latitude Co-altitude Polar distance Co-declination Co-latitude ANSWER DOWNLOAD EXAMIANS APP
Surveying G.M.T. corresponding to given mean time, equals None of these L.M.T. - East longitude in time L.M.T. + East longitude in time L.M.T. - West longitude in time None of these L.M.T. - East longitude in time L.M.T. + East longitude in time L.M.T. - West longitude in time ANSWER DOWNLOAD EXAMIANS APP
Surveying Sidereal day All listed here Is slightly shorter than an ordinary solar day Is divided into the conventional hours, minutes and seconds Is the period of time taken by the earth in making a complete rotation with reference to stars All listed here Is slightly shorter than an ordinary solar day Is divided into the conventional hours, minutes and seconds Is the period of time taken by the earth in making a complete rotation with reference to stars ANSWER DOWNLOAD EXAMIANS APP
Surveying The flying height of the camera is 1,000 m above mean ground level, the distance of the top of a building from a nadir point is 10 cm and the relief displacement of building is 7.2 mm. The height of the building, is 62 m 52 m 72 m 82 m 62 m 52 m 72 m 82 m ANSWER DOWNLOAD EXAMIANS APP