Power Systems Advantages of gauss siedel method is/are number of iterations are less calculation time for each iteration is less applicable for large power system network All of these number of iterations are less calculation time for each iteration is less applicable for large power system network All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Example of base load stations are both A and B. gas turbine. hydro. thermal. both A and B. gas turbine. hydro. thermal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has surge impedance of 400 Ω, operating at Vs = Vr = 400 kV line is compensated with a shunt capacitance of 30%. Find the surge impedance loading with compensation? 456 MW 386 MW 478 MW 400 MW 456 MW 386 MW 478 MW 400 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the fault current is 2000 A, the relay setting is 50% and CT ratio is 400 : 5, then plug setting multiplier will be 10. 25. 15. 50. 10. 25. 15. 50. ANSWER DOWNLOAD EXAMIANS APP
Power Systems MCB stands for miniature circuit breaker. minimum capacity breaker. maximum capacity breaker. molded circuit breaker. miniature circuit breaker. minimum capacity breaker. maximum capacity breaker. molded circuit breaker. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Proximity effect is more in case of same in both cases None of these power cables over head lines same in both cases None of these power cables over head lines ANSWER DOWNLOAD EXAMIANS APP