Power Systems Advantages of gauss siedel method is/are calculation time for each iteration is less number of iterations are less All of these applicable for large power system network calculation time for each iteration is less number of iterations are less All of these applicable for large power system network ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are advantages of N-R method? Number of iterations are less Applicable for large power system network both 1 and 2 Time taken for each iteration is less Number of iterations are less Applicable for large power system network both 1 and 2 Time taken for each iteration is less ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15 MW. The plant capacity is 20 MW. Find the reserve capacity of the plant? 5 MW 10 MW 20 MW 15 MW 5 MW 10 MW 20 MW 15 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a surge impedance of 400 Ω is connected with the cable having surge impedance of 40 Ω, a surge magnitude of 100 kV is travelling from the transmission line towards the cable. Find the reflected voltage? 18.18 kV 81.82 kV -18.18 kV -81.82 kV 18.18 kV 81.82 kV -18.18 kV -81.82 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows: IR1 = j1.5 pu, IR2 = -j0.5 pu, IR0 = -j1. The type of fault is LG LL LLG LLL LG LL LLG LLL ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line is operating under no load has ABCD parameters B = 100∠90° has a phase shift of 0.2 rad, how much shunt reactor is required for compensation of ferranti effect? 15.9 H 2 mH 2 H 15.9 mH 15.9 H 2 mH 2 H 15.9 mH ANSWER DOWNLOAD EXAMIANS APP