Power Systems Advantages of gauss siedel method is/are calculation time for each iteration is less applicable for large power system network number of iterations are less All of these calculation time for each iteration is less applicable for large power system network number of iterations are less All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 100 Km long transmission line is loaded at 110 kV. If the loss of line is 5 MW and the load is 150 VA the resistance of the line is 2.26 Ω / phase. 6.06 Ω / phase. 4.65 Ω / phase. 8.06 Ω / phase. 2.26 Ω / phase. 6.06 Ω / phase. 4.65 Ω / phase. 8.06 Ω / phase. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 12 MW 10 MW 6 MW 5 MW 12 MW 10 MW 6 MW 5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Skin effective is more in case of power lines None of these communication lines same in both cases power lines None of these communication lines same in both cases ANSWER DOWNLOAD EXAMIANS APP
Power Systems Lightning arresters are used to protect electrical equipment against power frequency of over voltages. over voltages due to indirect lightning stroke. over currents due to lightning stroke. direct strokes of lightning. power frequency of over voltages. over voltages due to indirect lightning stroke. over currents due to lightning stroke. direct strokes of lightning. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In which of the following frequency control method tie line may be overloaded? flat tie line control flat frequency control All of these parallel frequency flat tie line control flat frequency control All of these parallel frequency ANSWER DOWNLOAD EXAMIANS APP