Power Systems A string type insulator has three units with self capacitance C and ground capacitance of 0.2 C having a string efficiency of 82% 76% 78% 80% 82% 76% 78% 80% ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following method is/are more reliable? Newton Raphson (NR) method All of these Gauss-Siedel (GS) method Fast Decoupled Load Flow (FDLF) method Newton Raphson (NR) method All of these Gauss-Siedel (GS) method Fast Decoupled Load Flow (FDLF) method ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is not a secondary nuclear fuel U233. Pu239. U235. None of above. U233. Pu239. U235. None of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Installation of capacitors at suitable locations and of optimum size in a distribution system results in reduction of KVA rating of distribution transformers All of these improved voltage regulation reduction in distribution power loss reduction of KVA rating of distribution transformers All of these improved voltage regulation reduction in distribution power loss ANSWER DOWNLOAD EXAMIANS APP
Power Systems Example of base load stations are both A and B. gas turbine. thermal. hydro. both A and B. gas turbine. thermal. hydro. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants both operating and initial cost are high. operating cost is low and initial cost is high. both operating and initial cost are low. operating cost is high and initial cost is low. both operating and initial cost are high. operating cost is low and initial cost is high. both operating and initial cost are low. operating cost is high and initial cost is low. ANSWER DOWNLOAD EXAMIANS APP