Power Systems A sort line with R/X ratio 1, the zero regulation is obtained when the power factor of the load is 0.5 0 leading unity 0.707 leading 0.5 0 leading unity 0.707 leading ANSWER DOWNLOAD EXAMIANS APP
Power Systems The overall efficiency of a steam power plant equal to product of boiler efficiency, turbine efficiency and generator efficiency. regenerative cycle. binary vapor cycle. the Rankine cycle. product of boiler efficiency, turbine efficiency and generator efficiency. regenerative cycle. binary vapor cycle. the Rankine cycle. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Among the following which is not non conventional energy Tidal. Wind. Geothermal. Nuclear. Tidal. Wind. Geothermal. Nuclear. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 720 MW. 710 MW. 730 MW. 740 MW. 720 MW. 710 MW. 730 MW. 740 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the relation between sub transient (X"), transient (X') and synchronous reactance (X) ? X" > X' < X X" < X' < X X" < X' > X X" > X' >X X" > X' < X X" < X' < X X" < X' > X X" > X' >X ANSWER DOWNLOAD EXAMIANS APP
Power Systems The essential requirement(s) for power plants to be operated as peak load plants are All of these Capability of quick starts. Low capital cost. Quick response to load variation. All of these Capability of quick starts. Low capital cost. Quick response to load variation. ANSWER DOWNLOAD EXAMIANS APP