Process Equipment and Plant Design A minimum clearance of about __________ mm is maintained between the distillation column wall and the bubble cap. 76 95 38 19 76 95 38 19 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The clearance between two tubes in a shell and tube heat exchanger is known as 'ligament', whose minimum value is __________ the outside diameter of the tube, but in no case it should be less than 4.5 mm. Half Three fourth Equal to One fourth Half Three fourth Equal to One fourth ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In case of saddle packing (e.g., berl and intralox saddles), the maximum size of the packing should not exceed __________ of the column diameter. l/50th l/30th l/15th l/5th l/50th l/30th l/15th l/5th ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Ratio of tube length to shell diameter for a shell and tube heat exchanger is 4 : 1 to 8 : 1 for liquid-liquid exchanger Both B & C < 4 : 1 for gas-gas exchangers 8 : 1 to 12 : 1 for both liquid-liquid and gas-gas heat exchangers 4 : 1 to 8 : 1 for liquid-liquid exchanger Both B & C < 4 : 1 for gas-gas exchangers 8 : 1 to 12 : 1 for both liquid-liquid and gas-gas heat exchangers ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Baffle spacing is generally __________ the I.D. of the shell. Not less than one fifth of More than Both B and C Not greater than Not less than one fifth of More than Both B and C Not greater than ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Rate of filtrate delivery is inversely proportional to the Both A & B Filtering area & the pressure difference driving force Cake & filter medium resistance Viscosity of filtrate Both A & B Filtering area & the pressure difference driving force Cake & filter medium resistance Viscosity of filtrate ANSWER DOWNLOAD EXAMIANS APP