Process Equipment and Plant Design A minimum clearance of about __________ mm is maintained between the distillation column wall and the bubble cap. 76 95 38 19 76 95 38 19 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Corrosion allowance in the design of pressure vessel/chemical equipment is not necessary, if Wall thickness is > 30 mm Material of construction is high alloy steel Both B & C Plain carbon steel and cast iron parts are used Wall thickness is > 30 mm Material of construction is high alloy steel Both B & C Plain carbon steel and cast iron parts are used ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Which of the following packing materials provides for maximum mass transfer? Cross-partition rings Lessig rings All of these Raschig rings Cross-partition rings Lessig rings All of these Raschig rings ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The safe height (h) to diameter (d) ratio (i.e., h/d) for liquid/petro fuel storage tank of capacity more than 45 kilolitres is less than 3 3.5 2 1 3 3.5 2 1 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design __________ of water makes it a widely used coolant in heat exchangers. Low viscosity Low dirt factor High specific heat Low corrosiveness Low viscosity Low dirt factor High specific heat Low corrosiveness ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Liquid redistribution should be done in a packed tower packed with raschig rings every 6 metres or __________ times the column diameter, whichever is lower. 15-20 10-12.5 2.5-3.0 5-7.5 15-20 10-12.5 2.5-3.0 5-7.5 ANSWER DOWNLOAD EXAMIANS APP