MGVCL Exam Paper (30-07-2021 Shift 1)
A given solar cell has the following specifications:
Open-circuit voltage, Voc: 0.7 V
Short-circuit current, Isc: 3.5 A
Short-circuit current, Isc: 3.5 A
Short-circuit current, Isc: 3.5 A
If the solar cell operates at maximum power point, calculate the efficiency.

13.70%
14.70%
15.70%
12.70%

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Simultaneous tripping of the circuit breaker at both ends of a transmission line is achieved by

none of these
pilot protection
distance protection
overcurrent protection

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Talcher Super Thermal Power Station
Vindhyachal Thermal Power Station
Sasan Ultra Mega Power Plant
Mundra Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A single phase motor connected to 400 V, 50 Hz supply takes 30 A at a power factor of 0.7 lagging. Calculate the capacitance required in parallel with the motor to raise the power factor to 0.9 lagging.

79.5 μF
69.5 μF
99.5 μF
89.5 μF

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP