MGVCL Exam Paper (30-07-2021 Shift 3)
A 1000 kVA ONAN cooled transformer has a load of 500 kVA throughout the day except for a period of 2 hours. What is the permissible overload for a duration of two hours. Assume the permissible load kVA as a fraction of rated kVA is 1.43.
1.6 inches = 1.6 inches x 1,000 mils per inch = 1,600 mils 0.25 inch = 0.25 inch x 1,000 mils per inch = 250 mils Area = 1,600 x 250 = 400,000 square mils
Dynamic voltage restoration (DVR) is a method of overcoming voltage sags and swells that occur in electrical power distribution. Devices used for DVR include static var devices, which are series compensation devices that use voltage source converters (VSC). The DVR is used to inject three phase voltage in series and in synchronism with the network voltages in order to compensate voltage disturbances with a benefit of active /reactive power control.
The capacity factor is the ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period. Nuclear power plants are at the high end of the range of capacity factors