Power Electronics 4 thyristors rated 200 V in series. The operating voltage of the string is 0.600 V. Derating factor of the string is 0.7. 0.2. 0.75. 0.25. 0.7. 0.2. 0.75. 0.25. ANSWER DOWNLOAD EXAMIANS APP
Power Electronics A single phase full bridge inverter can operated in load commutation mode in case load consist of RLC overdamped. RLC underdamped. RL. RLC critically damped. RLC overdamped. RLC underdamped. RL. RLC critically damped. ANSWER DOWNLOAD EXAMIANS APP
Power Electronics Calculate the maximum voltage that can be safely blocked by the string shown in figure, if maximum allowable leakage current is 2 mA? 10 KV. 2 KV. 8 KV. 6 KV. 10 KV. 2 KV. 8 KV. 6 KV. ANSWER DOWNLOAD EXAMIANS APP
Power Electronics Which statement is true for latching current ? Both C and D. It is related to turn off process of the device. It is related to conduction process of device. It is related to turn on process of the device. Both C and D. It is related to turn off process of the device. It is related to conduction process of device. It is related to turn on process of the device. ANSWER DOWNLOAD EXAMIANS APP
Power Electronics BCT is used for High power current control. Low power current control. High power phase control. Low power phase control. High power current control. Low power current control. High power phase control. Low power phase control. ANSWER DOWNLOAD EXAMIANS APP
Power Electronics Delay time is defined by the interval when anode current reaches 10 % from forward leakage current. all of these. anode voltage drops from 100 % to 90 % of its actual value. gate current increases from 90 % to 100 % of its final value. anode current reaches 10 % from forward leakage current. all of these. anode voltage drops from 100 % to 90 % of its actual value. gate current increases from 90 % to 100 % of its final value. ANSWER DOWNLOAD EXAMIANS APP