Power Systems With reference to hydrometer station, the graphical representation of the discharge as function of time is known as Monograph. Hectograph. Hydro-graph. Load duration curve. Monograph. Hectograph. Hydro-graph. Load duration curve. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line is operating under no load has ABCD parameters B = 100∠90° has a phase shift of 0.2 rad, how much shunt reactor is required for compensation of ferranti effect? 2 H 15.9 mH 2 mH 15.9 H 2 H 15.9 mH 2 mH 15.9 H ANSWER DOWNLOAD EXAMIANS APP
Power Systems A string insulator has 4 units. The voltage across bottom most unit is 10 kV and its efficiency is 90%. Find the total operating phase voltage? 32 kV 40 kV 45 kV 36 kV 32 kV 40 kV 45 kV 36 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems The presence of earth in case of overhead lines increase capacitance increase inductance decrease capacitance decrease inducatance increase capacitance increase inductance decrease capacitance decrease inducatance ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following are the fertile materials U238 and Th232. U233 and Pu239. U238 and Pu239. U238 and Th239. U238 and Th232. U233 and Pu239. U238 and Pu239. U238 and Th239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems When bundle conductor are used in place of single conductor the effective inductance and capacitance will respectively increase and remain unaffected. increase and decrease. decrease and increase. decrease and remain unaffected. increase and remain unaffected. increase and decrease. decrease and increase. decrease and remain unaffected. ANSWER DOWNLOAD EXAMIANS APP