Power Systems With reference to hydrometer station, the graphical representation of the discharge as function of time is known as Hectograph. Hydro-graph. Load duration curve. Monograph. Hectograph. Hydro-graph. Load duration curve. Monograph. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A load centre is at an equidistant from the two thermal generating stations G1 and G2. The fuel cost characteristics of the generating stations are given by F1 = a + bP1 + cP²1 F2 = a + b P2 + 2cP²2 Where P1 and P2 are the generation in MW of G1 and G2, respectively. For most economic generation to meet 300 MW of load, P1 and P2 respectively, are 100, 200 200, 100 175, 125 150, 150 100, 200 200, 100 175, 125 150, 150 ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the methods of laying underground cables? None of these. Direct laying. Draw - in - system / duct - pipe laying. Both A and B. None of these. Direct laying. Draw - in - system / duct - pipe laying. Both A and B. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 25 MVA, 11 kV alternator is supplying full load at a point of 0.75 lagging. Determine the percentage increase in earning capacity when it is operated at improved power factor of 0.96 lagging. None of above 56 %. 28 %. 14 %. None of above 56 %. 28 %. 14 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Units of incremental cost is MWhr/Rs Rs/hr Rs/MWhr RsMW/hr MWhr/Rs Rs/hr Rs/MWhr RsMW/hr ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 220 kV system, the inductance and capacitance up to the circuit breaker location are 25 mH and 0.025 µF respectively. The value of resistor required to be connected across the breaker contacts which will give no transient oscillations, is 1000 Ω 500 Ω 25 Ω 250 Ω 1000 Ω 500 Ω 25 Ω 250 Ω ANSWER DOWNLOAD EXAMIANS APP