Irrigation Engineering Which of the following methods is used to estimate flood discharge based on high water marks left over in the past ? ultra-sonic method slope-area method moving boat method area-velocity method ultra-sonic method slope-area method moving boat method area-velocity method ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A river bend characterized by silting scouring on concave side scouring on convex side and on concave side silting on convex side scouring on concave side and silting on convex side scouring on concave side scouring on convex side and on concave side silting on convex side scouring on concave side and silting on convex side ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of the discharge over a trapezoidal crest to a rectangular crest of Sarda falls of identical parameters, is 1.054 1.084 1.064 1.074 1.054 1.084 1.064 1.074 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Finally formed berms in canals are provided for Control of seepage losses All of these Strengthening of banks Protection of banks erosion by the waves Control of seepage losses All of these Strengthening of banks Protection of banks erosion by the waves ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If Δ is the depth of water in metres, B is the number of days of base period and D is the duty in hectare/cumec, the relationship which holds good, is D = (8.6 Δ/B) B = Δ (8.64 B/D) D = Δ (8.64 D/B) Δ = (8.6 B/D) D = (8.6 Δ/B) B = Δ (8.64 B/D) D = Δ (8.64 D/B) Δ = (8.6 B/D) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called None of these Free board Height of bank Berm None of these Free board Height of bank Berm ANSWER DOWNLOAD EXAMIANS APP