Irrigation Engineering Which of the following methods is used to estimate flood discharge based on high water marks left over in the past ? moving boat method slope-area method area-velocity method ultra-sonic method moving boat method slope-area method area-velocity method ultra-sonic method ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A multipurpose reservoir is the one which is planned and constructed to serve various purposes designed for one purpose but serves more than one purpose None of these both (A) and (B) planned and constructed to serve various purposes designed for one purpose but serves more than one purpose None of these both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Canals taken off from ice-fed perennial rivers, are known Ridge canals Permanent canals Perennial canals Inundation canals Ridge canals Permanent canals Perennial canals Inundation canals ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For a unique design of a channel by Kennedy's theory All of these Its depth must only be known Its breadth must only be known Its breadth and depth ratio must only be known All of these Its depth must only be known Its breadth must only be known Its breadth and depth ratio must only be known ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to Load factor Both load and plant factor Utilization factor Plant factor Load factor Both load and plant factor Utilization factor Plant factor ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The best unit duration of storm for a unit hydrograph is 1 hour one-fourth of basin lag equal to basin lag one-half of basin lag 1 hour one-fourth of basin lag equal to basin lag one-half of basin lag ANSWER DOWNLOAD EXAMIANS APP