Irrigation Engineering Which of the following methods is used to estimate flood discharge based on high water marks left over in the past ? slope-area method area-velocity method ultra-sonic method moving boat method slope-area method area-velocity method ultra-sonic method moving boat method ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called Berm Height of bank None of these Free board Berm Height of bank None of these Free board ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A raingauge should preferably be fixed in a closed space in an open space near the building under the tree in a closed space in an open space near the building under the tree ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Borrow pits should preferably be located in Field on the left side of the canal Fields on both sides of the canal Field on the right side of the canal Central half width of the section of the canal Field on the left side of the canal Fields on both sides of the canal Field on the right side of the canal Central half width of the section of the canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A runoff river plant is None of these a low head scheme a high head scheme a medium head scheme None of these a low head scheme a high head scheme a medium head scheme ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If A is the area of the surface, x̅ is the depth of its C.G. from the surface of the water and ω is the density of water, then Total pressure on the surface is equal to ωx̅ All listed here Depth of the centre of pressure is 2/3H vertically below the surface Depth of the point at which total pressure acts is equal to its moment of inertia divided by Ax̅ Total pressure on the surface is equal to ωx̅ All listed here Depth of the centre of pressure is 2/3H vertically below the surface Depth of the point at which total pressure acts is equal to its moment of inertia divided by Ax̅ ANSWER DOWNLOAD EXAMIANS APP