Irrigation Engineering A land is known as waterlogged when the permanent wilting point is reached when gravity drainage has ceased capillary fringe reaches the root zone of plants None of these when the permanent wilting point is reached when gravity drainage has ceased capillary fringe reaches the root zone of plants None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Canals constructed for draining off water from water logged areas, are known Contour canals Drains Inundation canals Valley canals Contour canals Drains Inundation canals Valley canals ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If A is the area of the surface, x̅ is the depth of its C.G. from the surface of the water and ω is the density of water, then Depth of the centre of pressure is 2/3H vertically below the surface Total pressure on the surface is equal to ωx̅ Depth of the point at which total pressure acts is equal to its moment of inertia divided by Ax̅ All listed here Depth of the centre of pressure is 2/3H vertically below the surface Total pressure on the surface is equal to ωx̅ Depth of the point at which total pressure acts is equal to its moment of inertia divided by Ax̅ All listed here ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A river training work is generally required when the river is Aggrading Degrading Meandering All of these Aggrading Degrading Meandering All of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The net speed under which the turbine reaches its peak efficiency is called operating speed gross speed design speed rated speed operating speed gross speed design speed rated speed ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be 20 m3/sec 35 m3/sec 25 m3/sec 30 m3/sec 20 m3/sec 35 m3/sec 25 m3/sec 30 m3/sec ANSWER DOWNLOAD EXAMIANS APP