Irrigation Engineering The uplift pressure on the roof of an inverted syphon, is maximum when Drain in running dry Canal is running dry Drain is running with H.F.L. Canal is running with F.S.L. Drain in running dry Canal is running dry Drain is running with H.F.L. Canal is running with F.S.L. ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The best unit duration of storm for a unit hydrograph is one-fourth of basin lag one-half of basin lag equal to basin lag 1 hour one-fourth of basin lag one-half of basin lag equal to basin lag 1 hour ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the critical shear stress of a channel is XC, then the average value of shear stress required to move the grain on the bank is 1.33 TC XC 0.5 XC 0.75 TC 1.33 TC XC 0.5 XC 0.75 TC ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The depth of the crest of a scouring sluice below the crest of a head regulator, is generally kept 2.20 m 1.20 m 0.20 m 3.20 m 2.20 m 1.20 m 0.20 m 3.20 m ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In North Indian Plains, optimum depth of kor watering for wheat, is 17.5 cm 23.0 cm 19.0 cm 13.5 cm 17.5 cm 23.0 cm 19.0 cm 13.5 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A hyetograph is a graphical representation of cumulative rainfall and time discharge and time rainfall intensity and time rainfall depth and time cumulative rainfall and time discharge and time rainfall intensity and time rainfall depth and time ANSWER DOWNLOAD EXAMIANS APP