Irrigation Engineering The uplift pressure on the roof of an inverted syphon, is maximum when Canal is running with F.S.L. Drain in running dry Canal is running dry Drain is running with H.F.L. Canal is running with F.S.L. Drain in running dry Canal is running dry Drain is running with H.F.L. ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A minimum of 90 cm free board is provided if the discharge in the canal is between Over 60 cumecs 30 to 33 cumecs Over 100 cumecs 30 to 60 cumecs Over 60 cumecs 30 to 33 cumecs Over 100 cumecs 30 to 60 cumecs ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Seepage through foundation in an earthen dam is controlled by providing chimney drain horizontal blanket rock toe impervious cut off chimney drain horizontal blanket rock toe impervious cut off ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering With the increase in the quantity of water supplied, the yield of most crops increases upto a certain limit and then becomes constant increases continuously decreases continuously increases upto a certain limit and then decreases increases upto a certain limit and then becomes constant increases continuously decreases continuously increases upto a certain limit and then decreases ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If it rains between 2 P.M. and 3 P.M. and the entire basin area just starts contributing water at 3 P.M. to the outlet, then time of concentration will be 15 minutes 60 minutes 30 minutes 20 minutes 15 minutes 60 minutes 30 minutes 20 minutes ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The best unit duration of storm for a unit hydrograph is equal to basin lag one-fourth of basin lag 1 hour one-half of basin lag equal to basin lag one-fourth of basin lag 1 hour one-half of basin lag ANSWER DOWNLOAD EXAMIANS APP