Irrigation Engineering
Pick up the correct statement from the following and answer

In a level crossing a regulator is provided across the drainage at its down-stream
All of these
In a level crossing, a cross regulator is provided on the canal below the crossing
In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal

ANSWER DOWNLOAD EXAMIANS APP