Irrigation Engineering Disposal of extra excavated earth of canals, is utilized to provide a spoil bank on Left side Both sides All listed here Right side Left side Both sides All listed here Right side ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to Load factor Both load and plant factor Plant factor Utilization factor Load factor Both load and plant factor Plant factor Utilization factor ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The measure to remove water logging of land, is Neither (a) nor (b) To reduce percolation from canals and water courses Both (a) and (b) To increase outflow from the ground water reservoir Neither (a) nor (b) To reduce percolation from canals and water courses Both (a) and (b) To increase outflow from the ground water reservoir ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Garnett's diagrams are used for graphical solution of design equations of a canal by Lacey's theory Gibb's theory Kennedy's theory Lindlay theory Lacey's theory Gibb's theory Kennedy's theory Lindlay theory ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering S-hydrograph is used to obtain unit hydrograph of shorter duration from longer duration both (A) and (B) None of these longer duration from shorter duration shorter duration from longer duration both (A) and (B) None of these longer duration from shorter duration ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following is a flexible outlet ? Gibb’s outlet Kennedy’s gauge outlet None of these submerged pipe outlet Gibb’s outlet Kennedy’s gauge outlet None of these submerged pipe outlet ANSWER DOWNLOAD EXAMIANS APP