Irrigation Engineering In a concrete canal the approximate permissible velocity of water should not exceed 0.5 m/sec 1 m/sec 1.5 m/sec 2 m/sec 0.5 m/sec 1 m/sec 1.5 m/sec 2 m/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If it rains between 2 P.M. and 3 P.M. and the entire basin area just starts contributing water at 3 P.M. to the outlet, then time of concentration will be 20 minutes 30 minutes 15 minutes 60 minutes 20 minutes 30 minutes 15 minutes 60 minutes ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Infiltration capacity is a constant factor changes with both time and location changes with location changes with time is a constant factor changes with both time and location changes with location changes with time ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering An artesian aquifer is the one where None of these water surface under the ground is at atmospheric pressure water is under pressure between two impervious strata water table serves as upper surface of zone of saturation None of these water surface under the ground is at atmospheric pressure water is under pressure between two impervious strata water table serves as upper surface of zone of saturation ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering When a canal flowing under pressure is carried below a natural drainage such that its F.S.L. does not touch the underside of the supporting structure, the structure so provided, is called Super passage Aqueduct Syphon-aqueduct Syphon Super passage Aqueduct Syphon-aqueduct Syphon ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A land is said to be water-logged if its soil pores within A depth of 40 cm are saturated All listed here A depth of 50 cm are saturated Root zone of the crops are saturated A depth of 40 cm are saturated All listed here A depth of 50 cm are saturated Root zone of the crops are saturated ANSWER DOWNLOAD EXAMIANS APP