Irrigation Engineering In a concrete canal the approximate permissible velocity of water should not exceed 2 m/sec 1 m/sec 0.5 m/sec 1.5 m/sec 2 m/sec 1 m/sec 0.5 m/sec 1.5 m/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In case of a trapezoidal notch fall All listed here Top length of the piers should not be less than their thickness Splay downstream from the notch section is 22½° Splay upstream from the notch section is 45° All listed here Top length of the piers should not be less than their thickness Splay downstream from the notch section is 22½° Splay upstream from the notch section is 45° ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Presence of tail water in a gravity dami) increases the principal stressii) decreases the principal stressiii) increases the shear stressiv) decreases the shear stressThe correct answer is (i) and (iii) (i)and(iv) (ii) and (iv) (ii) and (iii) (i) and (iii) (i)and(iv) (ii) and (iv) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to Load factor Both load and plant factor Utilization factor Plant factor Load factor Both load and plant factor Utilization factor Plant factor ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Canals constructed for draining off water from water logged areas, are known Contour canals Valley canals Drains Inundation canals Contour canals Valley canals Drains Inundation canals ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Unit of runoff in M.K.S. system is cubic metre metre/sec cubic metre/sec square metre cubic metre metre/sec cubic metre/sec square metre ANSWER DOWNLOAD EXAMIANS APP