Power Systems Which of following power plants will take long period in erection and installation Gas turbine. Hydro Power Plant Thermal. Nuclear. Gas turbine. Hydro Power Plant Thermal. Nuclear. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If we increase the spacing between the phase conductors, the line capacitance decreases remains unaffected increases None of these decreases remains unaffected increases None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pelton wheel turbine is a high head turbine. none of above. medium head turbine. low head turbine. high head turbine. none of above. medium head turbine. low head turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Reheat cycle in thermal power plant is used to reduce loss of heat. improve condenser performance. increase thermal efficiency. utilize heat of flue gases. reduce loss of heat. improve condenser performance. increase thermal efficiency. utilize heat of flue gases. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If L and C are 4 mH and 0.0001 μF respectively a current chop of magnitude 50 Amp would induced a voltage 50 kV. 200 kV. 100 kV. 400 kV. 50 kV. 200 kV. 100 kV. 400 kV. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Gas-turbine. Hydro Power Plant Thermal. Nuclear. Gas-turbine. Hydro Power Plant Thermal. Nuclear. ANSWER DOWNLOAD EXAMIANS APP