Power Systems Which of following power plants will take long period in erection and installation Gas turbine. Thermal. Hydro Power Plant Nuclear. Gas turbine. Thermal. Hydro Power Plant Nuclear. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What type of back up protection is used for alternators? Buchholz relay. Mho relay. Impedance relay. IDMT relay. Buchholz relay. Mho relay. Impedance relay. IDMT relay. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has impedance of (0.005 + j0.05) pu. Find the line at which maximum value of negative DC off set current is produced, if it is applied with Vm cosωt? 2.63 msec 9.68 1.47 msec 4.68 msec 2.63 msec 9.68 1.47 msec 4.68 msec ANSWER DOWNLOAD EXAMIANS APP
Power Systems The generating station suitable to operate as peak load plant is Power station. Nuclear power station. Pumped storage. Thermal power station. Power station. Nuclear power station. Pumped storage. Thermal power station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of pumped storage plants is/are All of these operating time is minimum most economical as a peak load supply plant used as load frequency control All of these operating time is minimum most economical as a peak load supply plant used as load frequency control ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following buses is/are not PV buses? both 1 and 2 voltage control buses fixed shunt capacitor buses reactive power support buses both 1 and 2 voltage control buses fixed shunt capacitor buses reactive power support buses ANSWER DOWNLOAD EXAMIANS APP