Power Systems Which of following power plants will take long period in erection and installation Nuclear. Thermal. Gas turbine. Hydro Power Plant Nuclear. Thermal. Gas turbine. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems Resistance switching in normally employed in all breakers. minimum oil breakers. air blast circuit breaker. bulk oil breakers. all breakers. minimum oil breakers. air blast circuit breaker. bulk oil breakers. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For distortion less line which of following relation are true None of above. R = O, G = O. R/L = C/G. R/L = G/C. None of above. R = O, G = O. R/L = C/G. R/L = G/C. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 50 Hz, 17.32 kV generator is connected to a power system. The system reactance and capacitance per phase are 10 mH and 0.2 mF respectively. What is the maximum voltage across the contacts of the circuit breaker at an instant when it passes through zero? 29.28 kV 28.28 kV 31.28 kV 30.28 kV 29.28 kV 28.28 kV 31.28 kV 30.28 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following grounding is not practically preferred for protection of equipments? All of these isolated grounding resistance grounding reactance grounding All of these isolated grounding resistance grounding reactance grounding ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal protection switch is used to provide protection against overload. temperature. short circuit. over voltage. overload. temperature. short circuit. over voltage. ANSWER DOWNLOAD EXAMIANS APP