Power Systems Which of following power plants will take long period in erection and installation Thermal. Nuclear. Gas turbine. Hydro Power Plant Thermal. Nuclear. Gas turbine. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants operating cost is low and initial cost is high. both operating and initial cost are high. operating cost is high and initial cost is low. both operating and initial cost are low. operating cost is low and initial cost is high. both operating and initial cost are high. operating cost is high and initial cost is low. both operating and initial cost are low. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 3-phase transmission line, each phase is supported by 3 insulated discs, maximum voltage of each disc is 20 kV. Find the operating voltage of the transmission line per phase if efficiency of string is 80.6%. 20 kV 83.76 kV 48.36 kV 52.84 kV 20 kV 83.76 kV 48.36 kV 52.84 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems Two generating stations delivering a powers of P1 = 150 MW, P2 =100 MW and the B coefficients are B11 = 0.005, B22 = 0.002, B12=B21= -0.001. Find the transmission line losses? 85.5 105.2 102.5 95.5 85.5 105.2 102.5 95.5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line is operating under no load has ABCD parameters B = 100∠90° has a phase shift of 0.2 rad, how much shunt reactor is required for compensation of ferranti effect? 2 H 2 mH 15.9 mH 15.9 H 2 H 2 mH 15.9 mH 15.9 H ANSWER DOWNLOAD EXAMIANS APP
Power Systems The capacitance of an overhead transmission line increases with neither 1 nor 2 increase in height of conductors above ground both 1 and 2 increase in mutual geometrical mean distance neither 1 nor 2 increase in height of conductors above ground both 1 and 2 increase in mutual geometrical mean distance ANSWER DOWNLOAD EXAMIANS APP