Power Systems Which of following power plants will take long period in erection and installation Gas turbine. Thermal. Nuclear. Hydro Power Plant Gas turbine. Thermal. Nuclear. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠90° Ω, C = 0.5*10-6∠90° â„§. Find the no load receiving end voltage? 500 kV 600 kV 400 kV 320 kv 500 kV 600 kV 400 kV 320 kv ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following materials can be used as coolant Any of above. Heavy water. Helium. CO2. Any of above. Heavy water. Helium. CO2. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The per unit value of a 2 ohm resistor at 100 MVA and 10 kV base voltage is 2 pu 0.5 pu 4 pu 0.2 pu 2 pu 0.5 pu 4 pu 0.2 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The incremental fuel costs for two generating units G1 and G2 are given by Ic1 = 25 + 0.2 PG1 and Ic2 = 32 + 0.2 PG2, where PG1 and PG2 are real powers generated by the units. The economic allocation for a total load of 250 MW, neglecting transmission loss, is given by PG1 = 125 MW and PG2 = 125 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 142.5 MW and PG2 = 107.5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Load frequency control is achieved by properly matching the individual machines generator ratings. turbine inputs. reactive powers. generated voltages. generator ratings. turbine inputs. reactive powers. generated voltages. ANSWER DOWNLOAD EXAMIANS APP