Power Systems Which of following power plants will take long period in erection and installation Gas turbine. Thermal. Nuclear. Hydro Power Plant Gas turbine. Thermal. Nuclear. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 1.3. 0.83. 0.25. 0.44. 1.3. 0.83. 0.25. 0.44. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a surge impedance of 400 Ω for a length of the line of 200 km. If the length of line is increased to 400 km, then its surge impedance is 400 Ω 200 Ω 800 Ω 0 Ω 400 Ω 200 Ω 800 Ω 0 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following statement are false A thermal reactor needs a moderator material. Nuclear power plants are used as peak load plants only. In nuclear power plants, chain reaction is controlled by cadmium rods. In a nuclear reactor, multiplication factor is kept almost equal to one. A thermal reactor needs a moderator material. Nuclear power plants are used as peak load plants only. In nuclear power plants, chain reaction is controlled by cadmium rods. In a nuclear reactor, multiplication factor is kept almost equal to one. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where air circuit breakers are used? Up to 66 kV. Up to 33 kV. Up to 12 kV. Up to 11 kV. Up to 66 kV. Up to 33 kV. Up to 12 kV. Up to 11 kV. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a transmission line can be increased by increasing its voltage level both 1 and 3 addition of lumped capacitance in series addition of lumped inductance in parallel increasing its voltage level both 1 and 3 addition of lumped capacitance in series addition of lumped inductance in parallel ANSWER DOWNLOAD EXAMIANS APP