GETCO Exam Paper (22-07-2015) Which city is capital of Meghalaya? (As on 22/07/2015) Dispur Shilong Imphal Itanagar Dispur Shilong Imphal Itanagar ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Reactive power limit Short circuit limit Transient stability limit Steady state limit Reactive power limit Short circuit limit Transient stability limit Steady state limit ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The line current in a three phase unbalanced load are Ir= 4+j6, Ib= 2-j2 and Ic= -3+j2, then zero sequence component of current will be 9 + j10 3 + j6 3 - j6 1 + j2 9 + j10 3 + j6 3 - j6 1 + j2 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In case of a balanced three phase sinusoidal AC supply, because of the phase difference neutral current is high if load is not balanced neutral wire is not required, if load is balanced all are correct rotating magnetic field is produced neutral current is high if load is not balanced neutral wire is not required, if load is balanced all are correct rotating magnetic field is produced ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) For eliminating 7th harmonics from generated EMF in alternator the fractional pitch must be 7\8 2\3 6\7 5\6 7\8 2\3 6\7 5\6 ANSWER EXPLANATION DOWNLOAD EXAMIANS APP fractional pitch = Cos( α/2)α is obtain from: (nα/2)=90˚ where n is harmonicα=25.7143˚fractional pitch=6/7
GETCO Exam Paper (22-07-2015) What is the synonyms of 'Pragmatic'? Magnetic Practical Arrogant Uncertain Magnetic Practical Arrogant Uncertain ANSWER DOWNLOAD EXAMIANS APP