Waste Water Engineering In a fully mechanised composting plant, involves Mechanized segregation Mechanized receipt Mechanized pulverising of refuse All of these Mechanized segregation Mechanized receipt Mechanized pulverising of refuse All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For drainage pipes in buildings the test applied before putting them to use, is All listed here Straightness test Smoke test Water test All listed here Straightness test Smoke test Water test ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During purification process of sewage the gas given off, is Ammonia Carbon dioxide Hydrogen All listed here Ammonia Carbon dioxide Hydrogen All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Antisyphonage pipe is fitted At the beginning of sewer line With a W.'trap At the end of septic tanks On manholes At the beginning of sewer line With a W.'trap At the end of septic tanks On manholes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is d (0.785d + 0.011H)/Q d (0.022d + 0.085H)/Q d (0.285d + 0.011H)/Q d² (0.011d + 0.785H)/Q d (0.785d + 0.011H)/Q d (0.022d + 0.085H)/Q d (0.285d + 0.011H)/Q d² (0.011d + 0.785H)/Q ANSWER DOWNLOAD EXAMIANS APP