Waste Water Engineering In a fully mechanised composting plant, involves Mechanized pulverising of refuse Mechanized segregation All of these Mechanized receipt Mechanized pulverising of refuse Mechanized segregation All of these Mechanized receipt ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For drainage pipes in buildings the test applied before putting them to use, is Water test Smoke test All listed here Straightness test Water test Smoke test All listed here Straightness test ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During purification process of sewage the gas given off, is All listed here Carbon dioxide Hydrogen Ammonia All listed here Carbon dioxide Hydrogen Ammonia ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Antisyphonage pipe is fitted With a W.'trap At the end of septic tanks On manholes At the beginning of sewer line With a W.'trap At the end of septic tanks On manholes At the beginning of sewer line ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is d (0.285d + 0.011H)/Q d (0.022d + 0.085H)/Q d² (0.011d + 0.785H)/Q d (0.785d + 0.011H)/Q d (0.285d + 0.011H)/Q d (0.022d + 0.085H)/Q d² (0.011d + 0.785H)/Q d (0.785d + 0.011H)/Q ANSWER DOWNLOAD EXAMIANS APP