Waste Water Engineering Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for Under estimates of maximum and average flows Unexpected increase in the population Unexpected large scale infiltration of stream water All of these Under estimates of maximum and average flows Unexpected increase in the population Unexpected large scale infiltration of stream water All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A cylindrical ejector having its height 2 m fills after every 10 minutes with a peak sewage discharge of 0.0157 cumec. The diameter of the ejector chamber, is 2.30 m 2.40 m 2.45 m 2.50 m 2.30 m 2.40 m 2.45 m 2.50 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer pipes need be checked for Both A and B None of these Maximum flow Minimum flow Both A and B None of these Maximum flow Minimum flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In the activated sludge process Aeration is done with an admixture of previously aerated sludge Water is removed by centrifugal action Sludge is activated by constant stirring Aeration is continued till stability Aeration is done with an admixture of previously aerated sludge Water is removed by centrifugal action Sludge is activated by constant stirring Aeration is continued till stability ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering With self cleansing velocity in sewers Scouring occurs at bottom Neither silting nor scouring occurs at bottom Both silting and scouring occur at bottom Silting occurs at bottom Scouring occurs at bottom Neither silting nor scouring occurs at bottom Both silting and scouring occur at bottom Silting occurs at bottom ANSWER DOWNLOAD EXAMIANS APP