Waste Water Engineering Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for Unexpected large scale infiltration of stream water All of these Unexpected increase in the population Under estimates of maximum and average flows Unexpected large scale infiltration of stream water All of these Unexpected increase in the population Under estimates of maximum and average flows ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A cylindrical ejector having its height 2 m fills after every 10 minutes with a peak sewage discharge of 0.0157 cumec. The diameter of the ejector chamber, is 2.50 m 2.40 m 2.30 m 2.45 m 2.50 m 2.40 m 2.30 m 2.45 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer pipes need be checked for Both A and B Maximum flow Minimum flow None of these Both A and B Maximum flow Minimum flow None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In the activated sludge process Aeration is continued till stability Sludge is activated by constant stirring Water is removed by centrifugal action Aeration is done with an admixture of previously aerated sludge Aeration is continued till stability Sludge is activated by constant stirring Water is removed by centrifugal action Aeration is done with an admixture of previously aerated sludge ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering With self cleansing velocity in sewers Neither silting nor scouring occurs at bottom Scouring occurs at bottom Both silting and scouring occur at bottom Silting occurs at bottom Neither silting nor scouring occurs at bottom Scouring occurs at bottom Both silting and scouring occur at bottom Silting occurs at bottom ANSWER DOWNLOAD EXAMIANS APP