Surveying Triangulation surveys are carried out for locating All of these Control points for photogrammetric surveys Engineering works, i.e. terminal points of long tunnels, bridge abutments, etc. Control points for surveys of large areas All of these Control points for photogrammetric surveys Engineering works, i.e. terminal points of long tunnels, bridge abutments, etc. Control points for surveys of large areas ANSWER DOWNLOAD EXAMIANS APP
Surveying The time interval between successive transits of the moon, is 20 hours 25 minutes 24 hours 10 minutes 23 hours 50 minutes 24 hours 50 minutes 20 hours 25 minutes 24 hours 10 minutes 23 hours 50 minutes 24 hours 50 minutes ANSWER DOWNLOAD EXAMIANS APP
Surveying If the image of a triangulation station of R.L. 500 m is 4 cm from the principal point of a vertical photo taken from an altitude of 2000 m, above datum, the height displacement will be 6 mm 10 mm 2 mm 4 mm 6 mm 10 mm 2 mm 4 mm ANSWER DOWNLOAD EXAMIANS APP
Surveying The sidereal day is the time interval between two successive upper transits of First point of Aries The polar star First point of Libra Mean sun First point of Aries The polar star First point of Libra Mean sun ANSWER DOWNLOAD EXAMIANS APP
Surveying The prime vertical passes through The east point of the horizon The west point of the horizon The zenith point of the observer All of these The east point of the horizon The west point of the horizon The zenith point of the observer All of these ANSWER DOWNLOAD EXAMIANS APP
Surveying After fixing the plane table to the tripod, the main operations which are needed at each plane table station are (i) Levelling (ii) Orientation (iii) CenteringThe correct sequence of these operations is (i), (iii), (ii) (ii), (iii), (i) (iii), (i), (ii) (i), (ii), (iii) (i), (iii), (ii) (ii), (iii), (i) (iii), (i), (ii) (i), (ii), (iii) ANSWER DOWNLOAD EXAMIANS APP