MGVCL Exam Paper (30-07-2021 Shift 2)
A three-phase, 12 kV, 50 Hz and 300 kW load is operating at 0.8 pf lag. If the pf is to be improved to unity, using star connected capacitor, the per phase value of the reactive VAR required is:

75 kVAR
100 kVAR
50 kVAR
25 kVAR

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
Interposing current-transformer (CT) is used in differential protection of a transformer to

increase the sensitivity of the relay
limit the main CT secondary current
minimize the effect of saturation of the main CTs
match the standard ratio of CTs used on both sides of the transformer winding

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
A generating station having 'n' section busbars each rated at Q kVA with ×% reactance is connected on the tie-bars systems through busbar reactances of b%. Determine the short circuit kVA if a 3-phase fault takes place on one section.

Q[(1/x) - (n+1)/(bn-x)]
Q[(1/x) + (n+1)/(bn+x)]
Q[(1/x) + (n-1)/(bn+x)]
Q[(1/x) + (n+1)/(bn-x)]

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
According to Global Wind Energy Council in 2016, India ranked____ in the Global Wind Power Installed Capacity Index with cumulative installed wind power generation.

Second
Fourth
Third
First

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP