Control Systems
Time taken for the response to rise from zero to 100 % for very first time is called

 Delay time.
 Settling time.
 Rise time.
 Peak time.

ANSWER DOWNLOAD EXAMIANS APP

Control Systems
In the integral control of the single area system frequency error is reduced to zero. Then

 integrator o/p decreases but speed changer position moves up.
 integrator o/p increases but speed changer position comes down.
 integrator o/p decreases and speed changer position comes down.
  integrator output and speed changer position attain a constant value.

ANSWER DOWNLOAD EXAMIANS APP