The uplift pressure on a dam can be controlled by i) constructing cutoff under upstream face ii) constructing drainage channels bet-ween the dam and its foundation iii) by pressure grouting in foundation The corret answer is

(i), (ii) and (iii)
both (i) and (iii)
both (i) and (ii)
only (i)

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
In rigid module, the discharge

Depends upon the water level in the water course
Depends upon the water levels of both, i.e. distributary and water course
Depends upon the water level in distributary
Is independent of water levels in the distributary and water course

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
A water-logged land is found suitable for cultivation due to

Ease of tillage for preparation of the field for optimum condition of germination
Absence of aeration of soil from root zone of the plant
None of these
Regular supply of water to plants from the water table by capillary action