Surveying The type of surveying which requires least office work is plane table surveying theodolite surveying tacheomefry trigonometrical levelling plane table surveying theodolite surveying tacheomefry trigonometrical levelling ANSWER DOWNLOAD EXAMIANS APP
Surveying The negative sign is assigned to Correction for horizontal alignment Correction for slope All listed here Reduction to mean sea level Correction for horizontal alignment Correction for slope All listed here Reduction to mean sea level ANSWER DOWNLOAD EXAMIANS APP
Surveying The hour angle of the heavenly body for Greenwich meridian equals the hour angle of the body for any other meridian + longitude: Vernal equinox Mean sun True sun All listed here Vernal equinox Mean sun True sun All listed here ANSWER DOWNLOAD EXAMIANS APP
Surveying With standard meridian as 82° 30' E the standard time at longitude 90° E is 8 h 30 m. The local mean time at the place will be 7 h 30 m 9 h 00 m 7 h 00 m 8 h 00 m 7 h 30 m 9 h 00 m 7 h 00 m 8 h 00 m ANSWER DOWNLOAD EXAMIANS APP
Surveying A plate parallel is the line on the plane of the negative Along the bisector of the angle between the principal line and a perpendicular line through principal plane Perpendicular to the principal line None of these Parallel to the principal line Along the bisector of the angle between the principal line and a perpendicular line through principal plane Perpendicular to the principal line None of these Parallel to the principal line ANSWER DOWNLOAD EXAMIANS APP
Surveying A ’level line’ is a line passing through the objective lens and the eye-piece of a dumpy or tilting level line passing through the center of cross hairs and the center of eye piece horizontal line line parallel to the mean spheriodal surface of earth line passing through the objective lens and the eye-piece of a dumpy or tilting level line passing through the center of cross hairs and the center of eye piece horizontal line line parallel to the mean spheriodal surface of earth ANSWER DOWNLOAD EXAMIANS APP