Industrial Engineering and Production Management The time by which the activity completion time can be delayed without affecting the start of succeeding activities, is known as Interfering float Free float Duration Total float Interfering float Free float Duration Total float ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The basic difference between PERT and CPM is that Critical path is determined in PERT only Costs are considered on CPM only and not in PERT PERT deals with events and CPM with activities Guessed times are used in PERT and evaluated times in CPM Critical path is determined in PERT only Costs are considered on CPM only and not in PERT PERT deals with events and CPM with activities Guessed times are used in PERT and evaluated times in CPM ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Critical path on PERT/CPM chart is obtained by joining the events having Minimum slack Maximum slack No slack Average slack Minimum slack Maximum slack No slack Average slack ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If A is the total items consumed per year, P is the procurement cost per order, and C is the annual inventory carrying cost per item, then the most economic ordering quantity is given by AP/C (AP/C)² 2AP/C √(2AP/C) AP/C (AP/C)² 2AP/C √(2AP/C) ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The type of layout used for manufacturing steam turbines, is Any one of these Process layout Product layout Fixed position layout Any one of these Process layout Product layout Fixed position layout ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Material handling in automobile industry is done by Overhead crane All of these Belt conveyor Trolley Overhead crane All of these Belt conveyor Trolley ANSWER DOWNLOAD EXAMIANS APP