System Analysis and Design
The term Parallel Run refers to

All of these
the processing of two different jobs initiated from two terminals.
the same job run on two different computer to test their speeds
None of these
the concurrent operation of an existing system and a new system

ANSWER DOWNLOAD EXAMIANS APP

System Analysis and Design
Positive testing is

is checking the logic of one or more programs in the candidate system
making sure that the new programs do in fact process certain transactions according to Specifications
testing changes made in an existing or a new program
running the system with line data by the actual user

ANSWER DOWNLOAD EXAMIANS APP